Middleby Cooking Systems Group PS536 manual Slide the two sections of each shaft apart

Page 23

3.Disassemble and clean the drive and idler shafts using the following procedure.

a.Loosen (DO NOT REMOVE) the set screw on the outer drive sprocket. Then, slide the drive sprocket off the end of the drive shaft. See Figure 4-4.

b.Loosen (DO NOT REMOVE) the set screws on all four steel spacers (2 per shaft), AND on all twelve conveyor belt sprockets (6 per shaft).

c.Gently work the shaft sections out of the conveyor frame, removing the conveyor belt sprockets as necessary. See Figures 4-4 and 4-5.

d.Slide the two sections of each shaft apart.

e.Clean all of the shaft components thoroughly using a rag. Then, lubricate each solid inner shaft, AND the interiors of each hollow shaft, using an FDA-approved light food-grade lubricant. DO NOT lubricate the shafts using WD40 or a similar product. This can cause the shafts to wear rapidly.

f.Slide the hollow shaft sections over the solid inner shafts. Check that the hollow section that has a drive sprocket attached is placed at the end of the the drive shaft.

g.Slide the reassembled shafts into the conveyor frame. As the shafts are replaced, slide the steel spacers and conveyor belt sprockets onto the shafts. Refer to Figures 4-4 and 4-5.

h.After the shafts are properly aligned, position the steel spacers against the ends of the bushings on the conveyor frame. Tighten the set screws on the spacers to hold them in place. Leave the conveyor belt sprockets loose at this time.

i.Replace the outer drive sprocket. Tighten its set screw to hold it in place.

j.Refer to Part D, Conveyor Installation, in the Instal- lation section of this Manual to replace the con- veyor belt. As you replace the belt, position the conveyor belt sprockets.

k.After the belt is in place and the sprockets are correctly positioned, tighten the set screws to hold the sprockets in place.

4.Reinstall the end plugs and conveyor onto the oven.

5.Reattach the drive chains. Replace the chain cover.

7.Check the tension of the conveyor belt as shown in Figure 2-9 (in Section 2, Installation). The belt should lift between 1-2" (25-50mm). If necessary, adjust the belt tension using the procedure in Part D (Conveyor Installation) in the Installation section of this Manual.

8.Replace the crumb trays and exit tray onto the oven.

 

SECTION4-MAINTENANCE

 

Figure 4-5 - Disassembling the drive shaft

Spacer (2)

2. Loosen set

 

screws on belt

 

sprockets and

 

spacers (8)

Smooth

ENGLISH

 

sprocket (2)

 

Sprockets

 

w/teeth (4)

 

 

1. Remove outer

 

drive sprocket

Bushing

3. Slide shafts out

of frame

 

4. Disassemble,

clean, and

lubricate shafts

Figure 4-5 - Disassembling the idler shaft

Spacer (2)

1. Loosen set

 

screws on belt

 

sprockets and

 

spacers (8)

Smooth

sprockets (6)

Bushing

2. Slide shafts out

of frame

 

3.Disassemble, clean, and

lubricate shafts

23

Image 23
Contents PS536 Gas and Electric Ovens English Table of Contents Conveyor Drive Motor Moves the conveyor III. Oven SpecificationsOven Uses II. Oven Components see FigureElectrical specifications for electric ovens per oven cavity Installation Installation Kit Installation KIT see FigureOther ventilation concerns II. Ventilation SystemRequirements RecommendationsTop panel and base pad installation III. AssemblyStacking Restraint Cable InstallationAssembling and tensioning the conveyor Conveyor Installation10 Conveyor placement Final AssemblyConnection Rate regulator Must be installed in the line BeforeVI. Electrical Supply VII. GAS SupplyGas Conversion Gas Utility Rough-In RecommendationsLocation and Description of Controls II. Normal Operation STEP-BY-STEP If the oven uses this Digital Temperature ControllerTurn the Blower switch to the on I position Sary Press the Set Point Unlock keys at Same time. Wait 5b. Adjust the temperatureTemperature, if neces Controller to a desired setLight III. Quick Reference Digital Temperature ControllersActual SP LockOvertemp IV. Quick Reference Troubleshooting Perform the normal startup procedure Maintenance DailySplit Belt Disassembly and Cleaning II. Maintenance MonthlyIII. Maintenance Every 3 Months Disassembling the idler shaft Slide the two sections of each shaft apartLubricating the Blower Fan Bearings IV. Maintenance Every 6 MonthsKEY Spare Parts KIT Available sepa- rately. See Figure Blower BeltElectrical Wiring Diagrams Wiring diagram, PS536 Electric Oven 208/230V, 60 Hz, 3 Ph Wiring diagram, PS536 Electric Oven 380V, 50 Hz, 3 Ph English Français