Middleby Cooking Systems Group PS536 manual III. Assembly, Top panel and base pad installation

Page 9

III. ASSEMBLY

SECTION 2 - INSTALLATION

Figure 2-3 - Leg extension and casters installation

A.Top Panel and Base Pad Assembly

1.Install the four leg extensions onto the base pad using the 3/8"-16x1" screws, 3/8" flat washers, and 3/8" lockwashers supplied in the Base Pad Kit. See Figure 2-3. Check that the finished sides of each leg extension face OUTWARDS.

One rear leg should be attached using three 3/8"-16 x 1" screws and the 3/4" eyebolt, as shown in Figure 2-3. This eyebolt acts as the anchor point for the restraint cable assembly (see Part C, Restraint Cable Installation).

2.Install one caster onto each leg extension, as shown in Figure 2-4. Use the 3/8"-16x1" screws, 3/8" flat washers, and 3/8" lockwashers supplied in the Installation Kit. The locking casters should be installed at the FRONT of the oven. The non-locking casters should be installed at the REAR of the oven.

3.Install the top panel in place on the top oven cavity using the screws included in the base pad kit, as shown in Figure 2- 4.

4.Install the lower oven cavity onto the base pad. Check that the eyebolt welded onto the pad faces the rear of the oven.

Locking casters - FRONT of oven

Non-locking casters -

REAR of oven

Finished sides of

leg extension face corner of base pad

3/8" flat washer

3/8" lock

washer

3/8"-16 x 1" hex screw

3/4" eyebolt (inside corner of one rear leg extension only)

3/8" flat washer

3/8" lock

washer

3/8"-16 x 1" hex screw

ENGLISH

#10 x 2" screws

attach rear of

top panel

#10 x 1" screws attach front of top panel

Top oven

cavity

Figure 2-4 - Top panel and base pad installation

Bottom oven

cavity

Assembled

base pad

9

Image 9
Contents PS536 Gas and Electric Ovens English Table of Contents Oven Uses III. Oven SpecificationsII. Oven Components see Figure Conveyor Drive Motor Moves the conveyorElectrical specifications for electric ovens per oven cavity Installation Installation Kit Installation KIT see FigureRequirements II. Ventilation SystemRecommendations Other ventilation concernsTop panel and base pad installation III. AssemblyStacking Restraint Cable InstallationAssembling and tensioning the conveyor Conveyor Installation10 Conveyor placement Final AssemblyVI. Electrical Supply Rate regulator Must be installed in the line BeforeVII. GAS Supply ConnectionGas Conversion Gas Utility Rough-In RecommendationsLocation and Description of Controls If the oven uses this Digital Temperature Controller Turn the Blower switch to the on I positionII. Normal Operation STEP-BY-STEP Temperature, if neces 5b. Adjust the temperatureController to a desired set Sary Press the Set Point Unlock keys at Same time. WaitLight III. Quick Reference Digital Temperature ControllersSP Lock OvertempActual IV. Quick Reference Troubleshooting Perform the normal startup procedure Maintenance DailyII. Maintenance Monthly III. Maintenance Every 3 MonthsSplit Belt Disassembly and Cleaning Disassembling the idler shaft Slide the two sections of each shaft apartKEY Spare Parts KIT Available sepa- rately. See Figure IV. Maintenance Every 6 MonthsBlower Belt Lubricating the Blower Fan BearingsElectrical Wiring Diagrams Wiring diagram, PS536 Electric Oven 208/230V, 60 Hz, 3 Ph Wiring diagram, PS536 Electric Oven 380V, 50 Hz, 3 Ph English Français