SECTION 2 - INSTALLATION

B.Stacking

For single ovens, skip ahead to Part C, Restraint Cable Installation.

IMPORTANT

Middleby Marshall STRONGLY RECOMMENDS that PS536GS oven cavities be stacked using the following:

PS500 Series Stacking Lift Kit, P/N 30580

PS536 Stacking Hardware Kit, P/N 46494

Contact your Middleby Marshall Authorized Service Agent for complete stacking instructions.

Figure 2-6 - Stacking

1.Stack an oven cavity on top of the lower oven. Check the following:

All four sides of the lower lip (on the bottom edge of the oven cavity) overlap the top of the lower oven.

The oven is level.

The oven is firmly seated.

See Figure 2-6.

2.For triple ovens, repeat Step 1 to install the top oven cavity.

3.Install the top panel using the screws included in the base pad kit, as shown in Figure 2-7.

Figure 2-7 - Top panel installation

#10 x 2"

screws

Top

C.Restraint Cable Installation

For CE-approved ovens, skip ahead to Part D, Conveyor Installation.

For domestic and standard export ovens, continue with this Section to install the restraint cable.

Because domestic and standard export ovens are equipped with casters, a restraint cable assembly must be installed to limit the movement of the appliance without depending on the connector and the quick disconnect device or its associated piping. One end of the cable is anchored to the eyebolt on one of the rear leg extensions, while the other is anchored to the wall. See Figure 2-8.

After connecting the restraint cable, move the oven to its final location. Then, lock the two front casters.

panel

Figure 2-8 - Installing the Restraint Cable

Restraint cable

assembly

3/8"-16 x 1" eyebolt on rear leg extension

3/4” (19mm)

eyebolt

Wall of

structure

10

Image 10
Contents PS536GS Gas Ovens For Your Safety EnglishTable of Contents Oven Uses III. Oven SpecificationsConveyor Drive Motor Moves the conveyor Electrical specifications for gas ovens per oven cavity Installation Installation KIT see Figure Recommendations II. Ventilation SystemRequirements Other ventilation concernsIII. Assembly Top Panel and Base Pad AssemblyRestraint Cable Installation StackingConveyor Installation 10 Conveyor placementFinal Assembly 12 Conveyor and master link orientationAdditional Information Gas Ovens IV. Electrical SupplyConnection Gas Conversion During Pressure Testing Note the FollowingGAS Supply OvenEnglish Location and Description of Controls Not ShownDaily Shutdown Procedure Daily Startup ProcedureII. Normal Operation STEP-BY-STEP Overtemp III. Quick Reference Digital Temperature ControllerSP Lock Heat onMaintenance Maintenance DailySplit Belt Disassembly and Cleaning II. Maintenance MonthlyIII. Maintenance Every 3 Months Top Row T1 T2 T3 T4English Blower Belt IV. Maintenance Every 6 MonthsLubricating the Blower Fan Bearings KEY Spare Parts KIT QTY DescriptionEnglish QTY II. Installation KITSingleoven Doubleoven Deutsch Français III. PANELS, END Plugs and Window IIIa. PANELS, END Plugs Without WindowEnglish IV. Control Compartment English Machinery Compartment and GAS Train Not ShownEnglish VI. Rear Compartment and Blowers Item QTY DescriptionEnglish VII. SINGLE-BELT Conveyors Item QTY Conveyor DescriptionEnglish VIII. SPLIT-BELT Conveyors English English Deutsch English English Deutsch English Español Français Deutsch Hour Service Hotline