Lochinvar WH 55-399 operation manual Make UP

Page 46

Installation & Operation Manual

6 Hydronic piping

Figure 6-11Single Boiler - Full Flow - Single Temperature Zoned with Valves - DHW Piped as a Zone

ZONE #1

PRESSURE

REDUCING VALVE PRESSURE

GAUGE

BACKFLOW

PREVENTER

MAKE UP

WATER

SYSTEM SUPPLY

SENSOR

AIR SEPARATOR

EXPANSION

TANK

BALL VALVE (TYPICAL)

ZONE #2 ZONE #3 ZONE #4

ZONE VALVES (TYPICAL)

DIFFERENTIAL PRESSURE BYPASS VALVE (RECOMMENDED)

DRAIN POINT

(TYPICAL)

BOILER CIRCULATOR

Y-STRAINER (RECOMMENDED)

PRESSURE

RELIEF VALVE

HOT

WATER

OUT

ANTI-SCALD

MIXING VALVE

COLD WATER IN

BOILER

NOTICE

NOTICE

UNION

(TYPICAL)DRAIN

TEMPERATURE /

PRESSURE

GAUGE

It is the responsibility of the installer to ensure that the minimum flow requirements of the boiler are met at all times during boiler operation. If the minimum flow requirements cannot be met at any time the boiler must be hydraulically separated from the system.

Please note that these illustrations are meant to show system piping concept only, the installer is responsible for all equipment and detailing required by local codes.

46

Image 46
Contents Models WH 55 Contents Boiler operation When servicing boilerPlease read before proceeding Boiler waterKnight Wall Mount Boiler How it works Stainless steel heat exchangerModels 55 Ratings Knight Wall Mount Boiler Ahri RatingDetermine boiler location Installation must comply withCloset and alcove installations Before locating the boiler, check1Closet Installation Minimum Required Clearances Wall mounting location PrecautionsVent and air piping Prevent combustion air contaminationProducts to avoid When using an existing vent system to install a new boilerAreas likely to have contaminants When removing a boiler from existing common vent system Remove boiler from wood pallet Prepare boilerGas conversions Mounting to a concrete wall Mounting the boilerMounting to a wood studded wall Mounting to a metal studded wallGeneral venting Direct venting options Sidewall VentInstall vent and combustion air piping Air intake/vent connectionsModel Kit Number Equivalent Vent Length Requirements for installation in CanadaSizing Model Max Vent AirMaterials Air inlet pipe materialsOptional room air Air contaminationVent pipe Approved PVC/CPVC Vent Pipe and FittingsMaterial Standard Vent fittingsPolypropylene ModelCentrotherm InnoFlue SW Duravent Polypro Stainless steel vent Vent/air termination sidewall If using the alternate sidewall terminationSidewall direct venting Determine location2AClearance to Gravity Air Inlets Model Air Vent Centerline Width Prepare wall penetrationsPrepare wall penetrations Alternate Field Supplied Option Multiple vent/air terminationsSidewall termination optional concentric vent Sidewall termination installationDescription and usage 92 and 3 Concentric Vent Dimensional Drawing reference D on Sidewall termination optional concentric vent models12Concentric Vent Sidewall Attachment Multiventing sidewall terminationsVent/air termination vertical Vertical direct ventingPrepare roof penetrations Vertical termination installation Vertical termination optional concentric ventMultiventing vertical terminations Minimum Combustion AIR TypicalConcentric Venting Arrangement Alternate vertical concentric ventingVent / Air Inlet Size Minimum Existing Vent / Chase Size Existing vent as a chaseLow water cutoff device Hydronic pipingSystem water piping methods General piping information Chilled water systemNear boiler piping components Near boiler piping connections Circulator sizing35F Temperature Rise Applications 20F Temperature Rise Applications25F Temperature Rise Applications Pump Size GrundfosVariable speed pump setup Smart System / Multi-temperature loop control optionVariable speed pump option 3Single Boiler Primary / Secondary Piping Make UP Water Indirect Number of Units Boiler Member 8Single Boiler Multiple Temperature DHW Priority Model Required Pipe Sizes Boiler Make UP Boiler Connecting gas supply piping Gas connectionsNatural gas Propane GasCheck inlet gas supply Natural Gas Pipe Capacity ChartLength of Pipe in Straight Feet for 1/2 PSI Gas valve replacement Gas PressureInstallation must comply with Low voltage connections Field wiringLine voltage connections Flow switch Outdoor temperature sensorLouver proving switch ThermostatSystem supply sensor Alarm contactsWiring of the cascade Boiler management systemInstallation FieldwiringCondensate disposal Condensate drainCheck/control water chemistry Freeze protection when usedStart-up Fill and test water systemCheck thermostat circuits Clean/Inspect Trap AssemblyCheck for gas leaks Inspect/fill condensate system Inspect/check condensate lines and fittingsIf boiler does not start correctly Final checks before starting the boilerStart the boiler Check system and boiler2Operating Instructions Models 55 Operating Instructions Model Set space heating operation Natural Gas PropaneConfiguration of the cascade Verify DHW modeSet domestic hot water DHW operation Operating information GeneralProtection features Boiler temperature regulation Outdoor reset operation, if used CascadeSequence of operation Operation DisplayInstaller Access modesUser Knight wall mount boiler control module 1Control PanelCall for Heat Information Dial Function Owner maintenance Maintenance Maintenance and annual startupService technician See the following pages for instructions GeneralMaintenance Check control settings Check ignition ground wiringCheck all boiler wiring Flue vent system and air pipingPerform start-up and checks Check flame signalCleaning boiler heat exchanger Check burner flameDiagrams PC Interface2Wiring Diagram