Guardian Technologies 04760-2 Spark Plugs, Battery Maintenance, 8 - Setting the Spark Plug Gap

Page 21
Figure 4.6 — 7 kW, Engine Air Cleaner Location

Section 4 — Maintenance

Air-cooled 7 kW, 12 kW and 15 kW Generators

3.Wipe away dust or debris from inside of the air box and around edges.

4.Install the new air cleaner into the air box.

5.Install the cover. Turn the two cover screws clock- wise to tighten.

See the “Service Schedule,” Section 4.13 for air cleaner maintenance. See Section 1.5.1 for air filter replacement part number.

2.Remove the spark plug(s) and check the condi- tion. Replace the spark plug(s) if worn or if reuse is questionable. See Section 4.13 for recommend- ed inspection.

3.Check the spark plug gap using a wire feeler gauge. Adjust the gap to 0.76 mm (0.030 inch) for 7 kW and 0.50 mm (0.020 inch) for 12/15 kW by carefully bending the ground electrode (Figure 4.8).

Figure 4.6 — 7 kW, Engine Air Cleaner Location

Air Cleaner

Fuel

Regulator

 

 

 

3/4" Hole

Figure 4.7 — 12 kW and 15 kW Engine

Air Cleaner

Screw

Cover

Filter

4.6SPARK PLUG(S)

Reset the spark plug(s) gap or replace the spark plug(s) as necessary. See Section 4.13 for mainte- nance requirements.

1.Clean the area around the base of the spark plug(s) to keep dirt and debris out of the engine. Clean by scraping or washing using a wire brush and commercial solvent. Do not blast the spark plug(s) to clean.

Figure 4.8 – Setting the Spark Plug Gap

SET PLUG GAP AT 0.76 mm (0.030 inch) 7kW

Air Cleaner(0.508 mm (0.020 inch) 12/15kW

4.7BATTERY MAINTENANCE

The battery should be inspected per the “Service Schedule,” Section 4.13. The following procedure should be followed for inspection:

1.Inspect the battery posts and cables for tightness and corrosion. Tighten and clean as necessary.

2.Check the battery fluid level of unsealed batteries and, if necessary, fill with DISTILLED WATER ONLY. DO NOT USE TAP WATER IN BATTER- IES.

3.Have the state of charge and condition checked. This should be done with an automotive-type bat- tery hydrometer.

3/4" HoleFigure 4.7 — 12 kW and 15 kW Engine DANGER

Do not dispose of the battery in a fire. The battery is capable of exploding.

A battery presents a risk of electrical shock

and high short circuit current. The following pre- cautions are to be observed when working on batteries:

Remove watches, rings or other metal objects;

Use tools with insulated handles;

Wear rubber gloves and boots;

Do not lay tools or metal parts on top of the battery; and

Disconnect charging source prior to connecting or disconnecting battery terminals.

19

Image 21
Contents 04760-2 13 kW NG, 15 kW LP Models 04758-2 6 kW NG, 7 kW LP 04759-2 12 kW NG, 12 kW LPThis manual should remain with the unit  Not intended for use as Primary Power in place of utility ‹ OPERATION AND MAINTENANCE ‹ CONTENTS‹ HOW TO OBTAIN SERVICE INTRODUCTIONand Adjustments Section 2 - Post Installation Start-upSection 4 - Maintenance Section 5 - TroubleshootingIMPORTANT SAFETY INSTRUCTIONS  GENERAL HAZARDS  WARNING  This product contains or emits chemicals FIRE HAZARDS   ELECTRICAL HAZARDS  EXPLOSION HAZARDS  ‹ STANDARDS INDEX1.2 PROTECTION SYSTEMS 1.1 UNPACKING/INSPECTION1.3 SYSTEM SET LED DANGER1.4 THE GENERATOR Figure 1.1 - 7 kW, Single Cylinder GH-410 EngineFigure 1.2 - 12 kW/15 kW, V-twin GT-990/760 Engine 1.5 SPECIFICATIONS ‹ 1.5.1 GENERATOR‹ 1.5.2 ENGINE 1.6 FUEL REQUIREMENTS AND RECOMMENDATIONS 1.8 RECONFIGURING THE FUEL SYSTEM1.7 FUEL CONSUMPTION DANGER‹ 1.8.2 12KW AND 15KW, 990CC ENGINES 1.9 LOCATION‹ 1.9.1 GENERATOR Figure 1.4 - Demand Regulator1.11 THE BATTERY 1.10 BATTERY INSTALLATION‹ 1.9.2 TRANSFER SWITCH 1.9.2.1 7 kW, 12 kW and 15 kW Units Figure 1.5 - Battery Cable Connections2.1 BEFORE INITIAL START-UP 2.2 CHECK TRANSFER SWITCH OPERATION2.3 ELECTRICAL CHECKS Section 2 - Post Installation Start-up and Adjustments2.5 CHECKING AUTOMATIC OPERATION 2.4 GENERATOR TESTS UNDER LOAD2.6 ADJUSTING THE REGULATOR NATURAL GAS ONLY Figure 2.2 - Placement of RegulatorFigure 2.1 - Dual Fuel Regulators Figure 2.3 - Single Cylinder Engine Governor Adjustment 2.7 ENGINE GOVERNOR ADJUSTMENTFigure 2.4 - V-twin Engine Governor Adjustment Figure 2.5 - V-twin Full Load Speed Adjust Screw3.1 BREAK-IN PROCEDURE 2.8 VOLTAGE REGULATOR ADJUSTMENTFigure 2.6 - Voltage Adjustment Potentiometer ‹ 3.2.1 “AUTO” POSITION3.4 SEQUENCE OF AUTOMATIC OPERATION 3.3 AUTOMATIC TRANSFER OPERATION3.5 MANUAL TRANSFER OPERATION ‹ 3.5.1 TRANSFER TO GENERATOR POWER SOURCE‹ 3.5.2 TRANSFER BACK TO UTILITY POWER SOURCE 3.6 SETTING THE EXERCISE TIMER‹ 3.7.1 LOW OIL PRESSURE SWITCH Figure 3.2 - Manual Transfer Switch OperationFigure 3.3 - Low Oil Pressure and High Temperature Switches ‹ 3.7.2 HIGH TEMPERATURE SWITCH4.1 FUSE 4.2 CHECKING THE ENGINE OIL LEVEL‹ 4.3.2 OIL CHANGE PROCEDURE 4.5 CHANGING THE ENGINE AIR CLEANER4.3 CHANGING THE ENGINE OIL 4.4 CHANGING THE OIL FILTERFigure 4.6 - 7 kW, Engine Air Cleaner Location 4.7 BATTERY MAINTENANCEFigure 4.7 - 12 kW and 15 kW Engine Air Cleaner Figure 4.8 - Setting the Spark Plug Gap4.8 ADJUSTING VALVE CLEARANCE Figure 4.10 - Valve Clearance Adjustment4.9 COOLING SYSTEM ‹ 4.12.1 REMOVAL FROM SERVICE 4.12 OUT OF SERVICE PROCEDURE‹ 4.12.2 RETURN TO SERVICE 4.10 ATTENTION AFTER SUBMERSION4.13 SERVICE SCHEDULE ATTENTION It is recommended that all service workbe performed by the nearest Authorized Dealer Problem 5.1 TROUBLESHOOTING GUIDECause CorrectionSection 6 - Electrical Data ENGINE WIRINGCONTROL PANEL BOX CUSTOMERCONNECTION Electrical Schematic - 12 & 15 kW - Drawing No. 0D8501-B Section 6 - Electrical Data Section 6 - Electrical Data ENGINE WIRINGSection 6 - Electrical Data 224A 225AElectrical Schematic - 7 kW - Drawing No. 0D9014-C PRE PACKAGED UNITS ONLY Section 7 - Exploded Views and Parts ListsCLOTH, HARDWARE 266.7mm x 146mm 7KW PART NO. QTY. DESCRIPTIONFOAM, EXHAUST SIDE ENCLOSURE FRONT FOAM, BACK EXHAUST ENCLOSURE COVERSection 7 - Exploded Views and Parts Lists DESCRIPTION PART NO. QTY66 2, 5, 19, 20, 39, 40, 47, 64, 93 67 8, 11, 12 68 4, 5 Views and Parts Lists69 16A, 16B, 17 72 27, 28 73 3, 32, 33, 34, 35, 36, 40ASSEMBLY, CRANKSHAFT HORIZONTAL ASSEMBLY, CRANKCASE HOUSING WITHITEM PART NO. QTY. DESCRIPTION ROLLER BEARING, GOVERNOR PLATESection 7 - Exploded Views and Parts Lists ASSY, IGNITION COIL GV-990 CYLINDER 7 kW Generator - Drawing No. 0D3504-E 1.25 FT 1.8 FT32 31 12 kW and 15 kW Generator - Drawing No. 0D3417-L2.6 FT 3 FT1.44 FT Section 7 - Exploded Views and Parts Lists DESCRIPTION Section 7 - Exploded Views and Parts ListsSection 7 - Exploded Views and Parts Lists DESCRIPTION Section 7 - Exploded Views and Parts ListsSection 7 - Exploded Views and Parts Lists DESCRIPTION Section 8 - Mounting ALL DIMENSIONS IN MILLIMETERS INCHESDrawing No Air-cooledSection 9 - Notes MANUFACTURER’S EMISSION CONTROL SYSTEM WARRANTY COVERAGE YOUR WARRANTY RIGHTS AND OBLIGATIONSPURCHASER’S/OWNER’S WARRANTY RESPONSIBILITIES CALIFORNIA AND FEDERAL EMISSION CONTROL WARRANTY STATEMENTEMISSION RELATED PARTS INCLUDE THE FOLLOWING EMISSION CONTROL SYSTEM WARRANTYWARRANTY SCHEDULE GENERAC POWER SYSTEMS TWO YEAR LIMITED WARRANTY FOR GUARDIANTHIS WARRANTY SHALL NOT APPLY TO THE FOLLOWING PREPACKAGED EMERGENCY AUTOMATIC STANDBY GENERATORS