Aruba Spa Hot Tub Models 2003 owner manual START-UP Preparations

Page 11

continuous copper wire equivalent in size to the circuit con- ductors supplying this equipment or as required by local electrical codes.

All field installed metal components such as rails, ladders, drains or other similar hardware within 3 meters of the spa shall be bonded to the equipment grounding bus with cop- per conductors no smaller than #6 AWG wire.

Save these instructions.

START-UP PREPARATIONS

Before performing the operations in this section, make sure you have read and understood all of the previous instruc- tions set forth in this manual. Make sure the spa has been installed correctly, including electrical wiring connections as specified in the previous sections. The following procedures must be done in the order they are listed.

WARNING

Unions must be hand tightened before fill- ing the spa with water. Failure to do so may cause the unions to leak, which can damage the spa pack, and voids the warranty.

Things to check before turning on the power to the spa:

1.Make sure the spa is clean, and that there is no foreign material in the spa.

WARNING

Do not run the pump until the spa is full of

water. Running the spa pump without water could cause damage to the operating system and void the warranty.

10

Image 11
Contents Aruba Spas Dear Aruba Customer IntroductionHOW Your Aruba SPA is Built Getting Started Items Required for Installation of Your SPA Tools Required for InstallationImportant Safety Instructions Special Cold Weather Start UP Preparations Positioning Your SPAIndoor Installation Deck Installation Yard InstallationElectrical Connection Electrical Connection AccessImportant Safety Instructions START-UP Preparations SPA Pack Only turn union one turn Counter clockwise Initial START-UPSPA Operations Guide Filter Cycle Programming Pump buttonLight or LED Setting Water Temperature Micro Directional Hydrotherapy JetsSwirl Jet Cluster JetsMassage Jet Trouble Shooting Problem has Been Detected Pressure SwitchJET Blower System OzonatorsAqua Pure Water System Circulation PumpAqua Pure Water System cont’d Chemical Maintenance Initial Start UP Procedures Weekly Water Maintenance ScheduleConducting Proper Water Tests Bromine High pH Chemical Table Equivalents ChartProblems Associated with Improper Water Balance Low pHTo drain the spa Care for Your SPADraining Your SPA Causes of pH changeSPA Surface Filter CleaningCover CabinetPage Special Cold Weather Instructions Warranty Information Warranty Page Problem Diagnosis Action Trouble Shooting GuideEye or skin irritation PH is too low Weekly Maintenance Schedule Division Leathead Road Kelowna, BC V1X 2J8