2.11 TORQUE REQUIREMENTS
BOLT LOCATION | TORQUE |
Blade/Cutter Housing Spindle Bolt | |
Caster Bracket Mounts | |
Cutter Deck/Engine Deck Mount | |
Engine Mounting Bolts |
|
15 & 17 HP Kawasaki & Briggs & Stratton | |
Kohler & 12.5 HP Kawasaki | |
Transmission Shifter Lever |
3.ASSEMBLY INSTRUCTIONS
3.1Uncrate unit, leaving it on the pallet, place upper handle assembly, fuel tank, and shifter lever at the rear of the machine. Place casters at the front of the unit.
3.2Place a length of 4" x 4" block between the front of the cutter deck and the pallet.
3.3Remove the bolt bag from the top of the fuel tank support.
3.4Refer to Parts Manual to help you identify and locate parts and their proper position.
3.5Install casters to front of deck using appropriate hardware from the bolt bag (eight 3/8 x 3/4" bolts and eight 3/8" whizlock nuts); tightening the lower four bolts first, then the top four.
3.6Loosen the 5/16" hardware at the two (2) discharge deflector hinge points so that the deflector is snug, but can be moved up and down freely.
3.7Mount the fuel tank on the tank support.
Apply retaining adhesive
3.8Install Handle Assembly
Position the lower end of the handle assembly on the outside of the upper rear section of the fuel tank & handle support. Install one
Loosely secure each screw with a 3/8" nyloc nut. The handle can now be pivoted to allow positioning in one of the three holes allowing various adjustments for operator
comfort (See Figures 1 & 2). Once a proper position is found, install one 3/8 x 1" bolt in the bottom mounting holes on each side of the handle. Secure each bolt with a 3/8" nyloc nut. Tighten all hardware.
FIG. 1 UPPER HANDLE MOUNTING
- 9 -