Manuals
/
Brands
/
Kitchen Appliance
/
Ventilation Hood
/
GE
/
Kitchen Appliance
/
Ventilation Hood
GE
ZV800 installation instructions
Please, tick the box below to download manual:
Contents
Main
Safety Information
BEFORE YOU BEGIN
CAUTION:
PRUDENCE :
WARNING:
Design Information
CONTENTS
PRODUCT DIMENSION AND CLEARANCE
35-7/8"
ADVANCE PLANNING
CAUTION:
PRUDENCE :
Wall Framing for Adequate Support
POWER SUPPLY
WARNING:
DUCT FITTINGS
REMOVE THE PACKAGING
Remove the duct cover, parts box and other packaging.
TOOLS AND MATERIALS REQUIRED
(NOT SUPPLIED)
INSTALLATION BELOW A WALL CABINET
WALL MOUNT INSTALLATIONS
Wall Mount ZV800 Installation Heights
INSTALLATION BELOW A CABINET
CHECK INSTALLATION HARDWARE
Locate the hardware accessory box packed with the hood and check contents.
IMPORTANT
DUCTWORK, WIRING LOCATIONS
INSTALL DUCT BRACKET
INSTALL MOUNTING BRACKET
Page
CONNECT DUCTWORK
CAUTION:
PRUDENCE :
INSTALL DUCT COVERS
8
INSTALL FILTERS
FINALIZE INSTALLATION
10
IMPORTANT :
INSTALL MOUNTING BRACKET
4SIZE AND CUT DUCT PIECE (cont.)
CAUTION:
ATTENTION :
SIZE AND CUT DUCT PIECE
ADVERTISSEMENT
INSTALL DUCT COVERS
INSTALL FILTERS
8FINALIZE INSTALLATION
CABINET REQUIREMENTS
DUCTWORK, WIRING
Ceiling
HOUSE WIRING LOCATION:
IMPORTANT :
INSTALL SIDE L BRACKETS
4
CUT THE OPENING
INSTALL WOOD BLOCKS IF NECESSARY
REMOVE SIDE SCREW
COMPLETE THE INSTALLATION AND CONNECT DUCTWORK
MOUNT THE HOOD
8INSTALL FILTERS
10
INSTALL REAR MOUNTING SCREWS
Pub. No. 49-80267