GE ZV800 installation instructions Mount The Hood, Complete The Installation And Connect Ductwork

Models: ZV800

1 24
Download 24 pages 18.87 Kb
Page 22
Image 22
6 MOUNT THE HOOD

Installation Instructions

UNDER-CABINET INSTALLATION

6 MOUNT THE HOOD

Install a wood screw on each side of the mounting frame

Carefully, lift the hood into the cabinet. Guide the hood upwards to meet the ductwork.

IMPORTANT: One person must hold the hood in place while the other drives the screws into the mounting frame.

7COMPLETE THE INSTALLATION AND CONNECT DUCTWORK

Install 2 Screws into

Each Side Bracket

Drive 2 screws into each side bracket.

Be sure the screws engage the filler blocks or the cabinet bottom.

Pull the glass canopy forward to access and install 2 screws through the hood and into the brackets on both sides.

Use duct tape to secure the duct to the exhaust outlet in the top of the hood. Do not use screws at this location.

Install original top screws

If there is a noticeable gap between the hood and the bottom of the cabinet on the sides:

Slide canopy forward and install original top screws through the bottom of the hood and into cabinet bottom or frame.

NOTE: Install wood filler blocks if necessary to accept the screws.

22

Page 22
Image 22
GE ZV800 installation instructions Mount The Hood, Complete The Installation And Connect Ductwork