Design Information

CONTENTS

 

Wall-Mounted Installation – Recirculating

 

Design Information

 

Ductwork, Wiring Locations

14

 

Step 1, Install Framing for Hood Support

14

Product Dimensions and Clearances

3

Installation Options

3

Step 2, Install Mounting Bracket

15

Advance Planning, Ductwork, Framing

4

Step 3, Prepare the Hood

15

Power Supply

4

Step 4, Mount the Hood

16

Duct Fittings

5

Step 5, Size and Cut Duct Piece

16

Step 6, Connect Electrical

17

Installation Preparation

 

 

Step 7, Install Duct Covers

17

Tools and Materials Required

6

Step 8, Install Filters

18

Remove the Packaging

6

Step 9, Finalize Installation

18

Wall Mount Installations

7

Under-Cabinet Installation

 

Installation Below a Wall Cabinet

7

 

Cabinet Requirements

19

Check Installation Hardware

8

Ductwork, Wiring Locations

9

Ductwork, Wiring

19

Step 1, Install Framing for Hood Support

20

Wall-Mounted Installation – Vented to the Outside

 

 

Step 2, Prepare the Hood

20

Step 1, Install Framing for Hood Support

9

Step 3, Cut the Opening

21

Step 2, Install Mounting Bracket

10

Step 4, Install Side “L” Brackets

21

Step 3, Install Duct Bracket

10

Step 5, Remove Side Screw

21

Step 4, Prepare the Hood

11

Step 6, Mount the Hood

22

Step 5, Mount the Hood

11

Step 7, Complete Installation and Connect Ductwork

22

Step 6, Connect Ductwork

12

Step 8, Connect Electrical

23

Step 7, Connect Electrical

12

Step 9, Install Rear Mounting Screws

23

Step 8, Install Duct Covers

13

Step 10, Install Filters

23

Step 9, Install Filters

13

 

 

Step 10, Finalize Installation

13

 

 

 

 

 

 

PRODUCT DIMENSION AND CLEARANCE

INSTALLATION OPTIONS

*Height to Ceiling

1-1/2”

12-15/16” at Sides,

13-11/16” at Center

NOTE: The vent hood canopy extends forward 5-7/8”.

35-7/8”

*The Supplied Duct Cover Fits 8 ft. to 10 ft. Ceiling Heights

24” Min.

30” Max.

WALL-MOUNTED INSTALLATIONS

This hood may be installed onto a wall and vented to the outdoors, or it can be installed for recirculating operation. All necessary parts for a recirculating operation are shipped with the hood. No kits required.

*24” Min.

The vent hood must be installed 24” min., and 30” max. above the cooking surface. The telescopic duct cover conceals the ductwork running from the top of the hood to the ceiling.

The duct cover is sized to reach 8 ft. to 10 ft. ceiling heights.

The hood installation height, from the cooking surface to the bottom of the hood, depends upon ceiling height.

*Depending on Cabinet Height

UNDER-CABINET INSTALLATIONS

The hood may be installed beneath a cabinet. The cabinet must measure at least 20” from the bottom frame to the inside top. See page 19.

Both vented and recirculating operation can be accomplished in an under-cabinet installation. (Custom cabinet modification is required for recirculating operation.)

3

Page 3
Image 3
GE ZV800 installation instructions Contents, Product Dimension and Clearance Installation Options