GE ZV800 Prepare The Hood, Installation Instructions WALL-MOUNTED INSTALLATION-RECIRCULATING

Models: ZV800

1 24
Download 24 pages 18.87 Kb
Page 15
Image 15
3PREPARE THE HOOD

Installation Instructions

WALL-MOUNTED INSTALLATION—RECIRCULATING

2 INSTALL MOUNTING BRACKET

This vent hood must be secured to the horizontal support or wall studs.

With the template taped in place, use a punch to mark all mounting screw locations.

Drill 1/8” pilot holes at the 6 punched locations.

Remove the template.

The 2 holes in the support bracket holes must enter studs or the horizontal support.

Use wood screws to secure the mounting bracket to the wall. The screws must engage wall studs or the installed horizontal mounting support.

Check to be sure that the bracket is level. There is no way to level the hood after hanging it from this bracket.

3PREPARE THE HOOD

Remove the hood from the box. Remove packaging and tape.

Electrical

Remove 2 side

panel

cover screws

Remove one screw on each side of the cover on the electrical panel. Lift off the cover and set aside with screws.

Junction box

Inside screw

Secure

electrical panel

with 3 screws

Stand the electrical panel upright.

Align the screw holes in the bottom of the panel with the holes on the base of the hood at the front side.

Install 3 screws provided.

Snap the damper into the

 

Install

 

exhaust outlet on the top of

 

 

the hood.

 

damper

 

 

 

 

 

15

Page 15
Image 15
GE ZV800 Prepare The Hood, Installation Instructions WALL-MOUNTED INSTALLATION-RECIRCULATING, Install Mounting Bracket