Wire nuts
Strain relief for junction cover

Installation Preparation

TOOLS AND MATERIALS REQUIRED (NOT SUPPLIED)

…Tape measure

…Knife

…Spirit level

…Wire cutter/stripper

…Wire nuts

…Electric drill with 1/8" and 3/8" bits

…Phillips and flat blade screwdrivers

…Hammer

…Pliers

…Safety glasses

…Duct tape

…Tape to mount template

…Gloves to protect against sharp edges

…120V 60Hz. 15 or 20 Amp, 2 wire with ground Properly grounded branch circuit

…Strain relief for junction cover

…6" round metal duct, length to suit installation

…Saw or jig saw

…Conduit for house wiring and conduit connector

Spirit level

Measuring Tape

Pliers

Electric drill

 

with 1/8” and

 

3/8” Bits

Duct Tape

Safety glasses

Phillips

Flat blade

head

screwdriver

screwdriver

 

Gloves

Knife

Wire

cutter/stripper

Hammer

Saw or jig saw

Masking tape

Conduit

REMOVE THE PACKAGING

2-piece duct

cover

Remove the duct cover, parts box and other packaging.

Lift the hood out of the box.

Remove and properly discard the plastic wrapping.

Remove junction box cover.

6

Page 6
Image 6
GE ZV800 installation instructions Remove the Packaging, Tools and Materials Required not Supplied