Installation Instructions

WALL-MOUNTED INSTALLATION—VENTED TO THE OUTSIDE

6CONNECT DUCTWORK

Install ductwork, making connections in direction of airflow as illustrated.

Push duct over the exhaust outlet and damper.

Secure joints in ductwork with sheetmetal screws.

Wrap all duct joints with duct tape for an airtight seal.

Use duct tape to seal the flange connections.

CAUTION: Do not use sheet metal screws at the hood flange connection. Doing so will prevent proper damper operations. Seal connection with tape only.

Air flow

Duct tape over seam

and screw Screw

PRUDENCE :

Il ne faut pas utiliser de vis autoraurdeuses à la connexion du collet de la hotte. Ceci empêcherait le bon fonctionnement du registre. N’utiliser que du ruban adhésif pour assurer l’étanchéité du raccord.

7 CONNECT ELECTRICAL

Verify that power is turned off at the source.

WARNING: If house wiring is not 2-wire with a ground wire, a ground must be provided by the installer. When house wiring is aluminum, be sure to use U.L. approved anti-oxidant compound and aluminum-to-copper connectors.

ADVERTISSEMENT :

Si la maison n’est pas câblee avec deux fils et un fil

de terre, l’installateur doit installer un fil de terre. Quand les fils sont en aluminium, il faut prendre soin d’utiliser des connecteurs aluminium à cuivre avec une pâte antioxydante approuvée par U.L.

Remove junction box cover and knockout.

Use a conduit connector to secure the conduit to the junction box.

Connect white leads to branch circuit white lead.

Connect black leads to branch circuit black lead.

Connect green/yellow leads to branch circuit green lead or bare ground lead.

Secure all connections with wire nuts on each electrical connector.

Push wires into junction box and replace cover. Be sure wires are not pinched.

Secure electrical panel cover with original screws.