Installation Instructions

UNDER-CABINET INSTALLATION

1INSTALL FRAMING FOR HOOD SUPPORT

IMPORTANT: Framing must be capable of supporting 100 lbs.

View from rear

cleats

1” x 6” min.

mounting

support

Centerline of

installation

space

If drywall is present, mark the screw hole locations for the top mounting brackets. Remove the template.

Cut away enough drywall to expose 2 vertical studs at the bracket location indicated on the template.

Install a horizontal support at least 1” x 6” between two wall studs at the top bracket installation location.

The horizontal support must be flush with the room side of the studs. Use cleats behind both sides of the support to secure to wall studs.

Reinstall drywall.

2PREPARE THE HOOD

Remove the hood from the box. Remove packaging and tape.

Electrical

Remove 2 side

cover screws

panel

 

Remove one screw on each side of the cover on the electrical panel. Lift off the cover and set aside with screws.

Junction box

Inside screw

Secure

electrical panel

with 3 screws

Stand the electrical panel upright.

Align the screw holes in the bottom of the panel with the holes on the base of the hood at the front side.

Install 3 screws provided.

Snap the damper into the

 

Install

exhaust outlet on the top of

damper

the hood.

 

 

20

Page 20
Image 20
GE ZV800 installation instructions Install