GE ZV800 Installation Instructions UNDER-CABINET INSTALLATION, Cabinet Requirements, Ceiling

Models: ZV800

1 24
Download 24 pages 18.87 Kb
Page 19
Image 19
Installation Instructions

Installation Instructions

UNDER-CABINET INSTALLATION

CABINET REQUIREMENTS

This hood may be installed beneath a wall-mounted cabinet.

If the cabinet has been installed, it must be removed so that wall framing supports can be added.

20” Min.

24” Min.

The cabinet must be at least 20” high between the bottom frame and the inside top. If the cabinet is not 20” from bottom to inside top, a custom cabinet or modifications to a different size cabinet and/or soffit may be required to accommodate the hood housing.

The cabinet must be 36” wide and at least 12” deep.

The cabinet must be firmly secured to wall studs or the added framing support and capable of supporting 100 pounds.

DUCTWORK, WIRING

Determine the exact location of the vent hood.

Locate the Rear Wall Template packed with the literature.

Measure 36” from the floor to the top of the cooking surface. Add the pre-determined hood installation height. Mark that location.

Use a level to draw a straight pencil line on the wall.

CABINET REQUIREMENTS3-3/4” centerline to wall

DUCTWORK, WIRING Ceiling

Top frame mounting

screw locations

19-1/2”

13-3/4"

12-3/4"

Drill 1/8"

Drill 1/8"

Pilot Holes

Pilot Holes

Drill 1/8"

Drill 1/8"

Pilot Holes

Pilot Holes

 

5-1/16"

 

9-5/8"

C

L

REAR WALL TEMPLATE

10-3/4”

11-3/4”

19

Drill 1/8"

Drill 1/8"

Pilot Holes

Pilot Holes

 

ALIGN BOTTOM EDGE WITH

8-1/8"

PENCIL LINE INDICATING

 

BOTTOM OF THE HOOD.

2-1/16"

49-80271 JR 07-04

Tape the template in position along the penciled line. Check to be sure the template is level.

Use the level to draw a line straight up, from the centerline on the template to the ceiling.

Measure 3-3/4” from the back wall to the centerline of a 6-1/2” hole on the ceiling.

NOTE: If drywall is not present, add drywall thickness to the 3-3/4” dimension.

HOUSE WIRING LOCATION:

The junction box is located on the top right side of the hood.

Wiring should enter the back wall 20” to 26” above the bottom of the hood, and within 4” of the right side of the centerline. Wiring should enter at least 4” above the right side of the frame.

Page 19
Image 19
GE ZV800 Installation Instructions UNDER-CABINET INSTALLATION, Cabinet Requirements, Ductwork, Wiring, Ceiling