Installation Instructions

WALL-MOUNTED INSTALLATION—RECIRCULATING

DUCTWORK, WIRING LOCATIONS

Determine the exact location of the vent hood.

Locate the template packed with the literature.

Measure 36” from the floor to the top of the cooking surface. Add hood installation height determined on page 7. Mark that location.

Ceiling

Drill 1/8"

Drill 1/8"

Pilot Holes

Pilot Holes

Drill 1/8"

Drill 1/8"

Pilot Holes

Pilot Holes

 

5-1/16"

 

9-5/8"

13-3/4"

C

 

12-3/4"

L

REAR WALL TEMPLATE

Drill 1/8"

Drill 1/8"

Pilot Holes

Pilot Holes

ALIGN BOTTOM EDGE WITH

8-1/8"PENCIL LINE INDICATING BOTTOM OF THE HOOD.

2-1/16"

49-80271 JR 07-04

Tape the template in position along the penciled line.

CHECK TO BE SURE THE TEMPLATE IS LEVEL.

Use a level to draw a line straight up, from the centerline on the template to the ceiling.

HOUSE WIRING LOCATION:

The junction box is located on the top right side of the hood.

Wiring should enter the back wall 20” to 26” above the bottom of the hood, and within 4” of the right side of the centerline.

1INSTALL FRAMING FOR HOOD SUPPORT

IMPORTANT: Framing must be capable of supporting 100 lbs.

View from rear

cleats

1” x 6” min.

mounting

support

Centerline of

installation

space

If drywall is present, mark the screw hole locations for the top mounting brackets. Remove the template.

Cut away enough drywall to expose 2 vertical studs at the bracket location indicated on the template.

Install a horizontal support at least 1” x 6” between two wall studs at the top bracket installation location.

The horizontal support must be flush with the room side of the studs. Use cleats behind both sides of the support to secure to wall studs.

Reinstall drywall.

14

Page 14
Image 14
GE ZV800 Wall-Mounted Installation-Recirculating, Tape the template in position along the penciled line