GE ZV800 Install Duct Covers, Finalize Installation, Install Filters, Installation Instructions

Models: ZV800

1 24
Download 24 pages 18.87 Kb
Page 13
Image 13
8 INSTALL DUCT COVERS

Installation Instructions

WALL-MOUNTED INSTALLATION—VENTED TO THE OUTSIDE

8 INSTALL DUCT COVERS

9 INSTALL FILTERS

Place the decorative duct covers on top of the hood.

NOTE: The inside (upper) duct piece has holes on one end. The holes are intended for use when the hood is installed for recirculating purposes. Slide the vented end into the outer piece, the vent holes should not be visible in this installation.

Mounting9 INSTALL FILTERS screws

Remove protective film on the filters.

Filter Locks

The inside duct piece must slip into the folded ends of the outer section.

Install 2 screws, duct cover and into ceiling bracket

Install

2 bottom duct cover screws

Extend the inner duct upwards to the ceiling bracket.

Secure duct cover to ceiling bracket with 2 screws.

Secure the lower duct cover to the hood by installing 2 screws from the bottom of the hood into the duct cover.

NOTE: The charcoal filter is not required for this installation.

Tip the filter into the slots at the rear of the opening. Lift the filter lock and pull forward until the filter rests in the slots.

Install both metal grease filters.

To remove the filters, press inwards on the handle and pull the filter downwards.

10FINALIZE INSTALLATION

Remove all packaging materials.

Refer to the Owner’s Manual for operating instructions.

13

Page 13
Image 13
GE ZV800 installation instructions Install Duct Covers, Finalize Installation, Install Filters, Installation Instructions