3Com 3500 appendix Module LED Status, Possible Sources of Problem and Steps to Take

Models: 3500

1 16
Download 16 pages 1.35 Kb
Page 14
Image 14
Module LED Status

14Quick Installation Guide

Table 8 Troubleshooting Abnormal Activity on the Module Status LEDs

Module LED Status

Possible Sources of Problem and Steps to Take

 

 

PWR LED lights yellow.

Possible source of problem:

 

Module is not fully inserted.

 

Module has failed.

 

Recommended actions:

 

Verify that the module is fully inserted.

 

Replace the module with a new one.

 

 

INS LED lights yellow.

Possible source of problem:

 

Module is partially inserted.

 

Recommended action:

 

Remove the module and reinsert it.

 

 

ERR LED lights yellow.

Possible source of problem:

 

Module did not successfully complete the

 

 

power-up diagnostics.

 

Recommended actions:

 

Reboot the system.

 

If the ERR LED remains yellow, contact your

 

 

network supplier or 3Com Technical Support.

 

 

E LED (Error - Port Status)

Possible source of problem:

lights yellow.

Module did not successfully complete power-up

 

 

 

diagnostics.

 

An error condition has occurred with the

 

 

associated port, or the port has been disabled

 

 

through the Administration Console or

 

 

WebConsole.

 

Recommended actions:

 

1

Verify that all cables are firmly inserted into the

 

 

system’s affected port and the attached device.

 

2

Check the L LED (Link - Port Status).

 

3

Test for faulty cables.

 

4

If the E LED (Error - Port Status) remains yellow,

 

 

contact your network supplier or 3Com Technical

 

 

Support.

 

 

 

Page 14
Image 14
3Com 3500 Module LED Status, Possible Sources of Problem and Steps to Take, Module did not successfully complete power-up