Chapter 3. Operation

1.Follow standard operating procedure to access the 4)TEST menu item.

2.With the cursor on 2)RUN SELFTEST, press ENTER.

A changing display in the LCD showing the test outcome displays.

S Y S T E M S E L F - T E S T

A L L T E S T S P A S S E D

3.Press the CANCEL key to exit.

3)Port Tests submenu of 4)Test

Port Tests are used to control the activation of a DTE loopback. This test loops data received at theV.35 interface back towards the DTE.

1.With the cursor on main menu item 4)TEST, press ENTER. The first two Test submenu items with the cursor on 1)NETWORK TESTS displays.

2.Use the down scroll key to select 3) PORT TESTS.

3.Press ENTER. The loopback setting displays.

1) D T E L O O P B C K : O F F

4.Use the scroll keys to select OFF or ON.

ON - the DTE Loopback is activated

OFF - deactivates looping (returns unit back to normal state)

5.Press the CANCEL key to exit.

61200060L1-1

TSU User Manual

3-29

Page 65
Image 65
ADTRAN T1-FT1 user manual S T E M S E L F T E S T, T E L O O P B C K O F F, 3Port Tests submenu of 4Test