
ASSEMBLY
A-FRAME INSTALLATION (Model 284)
1.Attach the
2.Attach the Lift Strap Bars (1) to the Mainframe with two 5/8” bolts (16), 5/8” flatwasher (17), bushing (18) and 5/8” locknut.
3.Attach flex links (3) to
4.Insert quick hitch bushing (5) between
5.Insert 5/8” x
6.Insert bolt (13) through 2nd hole from front in rear braces (1) and secure with locknut (10).
7.Insert 5/8” x
DRIVELINE ATTACHMENT
Before starting assembly, make certain that all paint, dirt, and grease are removed from gearbox shaft (1). To ease assembly apply a light coat of grease to splines and assemble. Do not assemble a driveline without a shield. Entanglement in rotating shafts can kill. Figure
Attach slip clutch end of the driveline to the gearbox input shaft securely. Make certain that the slip clutch is fully onto the input shaft splines. Tighten the locknuts (2) alternately until they have reached the proper torque. Refer to Torque Chart in the Maintenance Section.
260/272/284 01/11 | Assembly Section |
© 2011 Alamo Group Inc.
ASSEMBLY