NOTE: Figure ASM-0038 shows optional spring shock installation.

ASSEMBLY

ASSEMBLY

HYDRAULIC OR MANUAL LIFT (Model 284 Only)

Install the Hydraulic Cylinder or the manual Ratchet Lift Screw (Asm-0039)between the Axle Center Lug and the Lug directly behind the Center Gearbox. Install cylinder pins provided and retain with cotter pins.

NOTE: Figure ASM-0038 shows optional spring shock installation.

CHECK CHAINS (Extra Equipment)

Check chains are available for attachment to front of cutter as an accessory. Check chains are used to control cut height and especially allows cutter to always be lowered to the same preset cut height.

Drill a 11/16" hole through each lifting lug 2-1/2" below the lift pins and 5/8" from the front of the lug.

Install lower end of check chain (1) to hitch ears, through lower holes using bolts (2), washers (3) and locknuts

(4). Tighten securely.

Install chain lugs (5) on either side of tractor top link mounting using bolt or pin of required diameter and length. Cat. I kit requires a 3/4" diameter bolt.

Cutting height is then set by placing proper chain link in keyhole slot. Cutting height is easily adjusted by hooking chain higher or lower in the keyhole brackets.

Tractor attaches with Top Link Pin.

NOTE: For additional safety in transport, raise mower as high as possible without allowing the driveline to contact the deck, and shorten the chains as much as possible to prevent inadvertent falling in transport.

NOTE: 260 and 272 units use a Cat I Kit and 284 Units use a Cat II Kit.

260/272/284 01/11

Assembly Section 3-10

© 2011 Alamo Group Inc.

Page 50
Image 50
Alamo 272, 260 manual CHECK CHAINS Extra Equipment, Assembly, HYDRAULIC OR MANUAL LIFT Model 284 Only