Alamo SL60 manual PRE-OPERATION Inspection and Service

Models: SL60

1 126
Download 126 pages 17.07 Kb
Page 97
Image 97
(SG-21)
(SPU-31)

OPERATION

7. PRE-OPERATION INSPECTION AND SERVICE

Before each use, a pre-operation inspection and service of the implement and tractor must be performed. This includes routine maintenance and scheduled lubrication, inspecting that all safety devices are equipped and functional, and performing needed repairs. DO NOT operate the unit if the pre-operation inspection reveals any condition affecting safe operation. Perform repairs and replacement of damaged and missing parts as soon as noticed. By performing a thorough pre-operation inspection and service, valuable down time and repair cost can be avoided. OPS-U-0029

Always disconnect the auxiliary hydraulic couplers from the Power Unit before performing service on the Implement. Never work on the Implement with the Power Unit auxiliary hydraulics connected. Rotating parts such as blades could turn without warning and cause immediate entanglement, injury or death.

Periodically inspect all moving parts for wear and replace when neces- sary with authorized service parts. Look for loose fasteners, worn or bro- ken parts, and leaky or loose fittings. Make sure all pins have cotter pins and washers. Serious injury may occur from not maintaining this machine in good working order.

SL60 03/08

Operation Section 4-13

© 2008 Alamo Group Inc

OPERATION

Page 97
Image 97
Alamo SL60 manual PRE-OPERATION Inspection and Service