Installation

The threaded end of the bolts should extend 2 inches (5 cm) above the surface of the floor.

Refer to Figure 5 for a typical installation of individual mounting bolts on a UW60.

1

2

3/4 in.

(19 mm) 1

2 in.

(51 mm)

8in.

(203 mm)

1Frame

2Grout

Figure 5

2

PHM178N

3

4

P035I

1Machine Base

2Mounting Bolt Threads

3Grouting

4Reinforcing Rod

Figure 6

If the existing floor is not reinforced concrete at least 6 inches (15 cm) thick over a solid foundation, cut a hole approximately 5 feet square through the existing

A bolt-locator fixture or rebar frame is available as an option. This rigid welded assembly made of reinforcing rod and mounting bolts is designed to be embedded in concrete. Refer to Figure 6.

floor. Excavate to a depth of 6 inches (15 cm) from the top of the existing floor. Produce a pyramid-shaped hole by excavating the bottom of the hole to a width

6 inches (15 cm) wider on each side than the width of the top of the hole. Fill with 6 inches of reinforced concrete. Embed the mounting bolts or base frame as the concrete is poured. Ensure that the bolt threads extend 2 inches (5 cm) above floor level.

NOTE: Concrete should be poured at least

12 inches (30 cm) under the existing floor on all four sides and tied in with rebar.

22

© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT

F232085