After the concrete has cured, proceed as follows:
1.Place the
2.Remove the wood skid by unscrewing the carriage bolts holding the skid to the bottom frame of the
3.Place the
4.Raise and level the
5.Fill the space between the
Grout completely under all frame members. (Remove front panel and rear panel to gain access to all frame members.) Refer to Figures 7 and 8. Force grout under machine base until all voids are filled.
|
| |
|
| (103 mm) |
| Typical | |
|
| |
(568 mm) |
| |
(775 mm) |
|
|
| 22 in. |
|
| (559 mm) |
|
|
| |
|
| (103 mm) |
| Typical | |
|
| |
UW35 | (765 mm) |
|
| PHM547N | |
|
| |
|
| PHM547N |
Figure 7
Installation
(905 mm)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||
|
|
| (708 mm) |
|
|
| |||
|
|
|
|
| |||||
36 in. |
|
|
|
|
|
|
| (103 mm) | |
|
|
|
|
|
|
| |||
(914 mm) |
|
|
|
|
|
|
| Typical | |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
(103 mm)
Typical
UW60
PHM548N
Figure 8
6.Remove the spacers carefully, allowing the machine to settle into the wet grout.
7.Before grout sets completely, make a drain opening in the rear of the
8.Position the mounting bolt washers and locknuts on the anchor bolts and fingertighten locknuts to machine base.
9.After the grout is completely dry, tighten the locknuts by even increments – one after the other – until all are tightened evenly and the
NOTE: Check and retighten the locknuts after five to ten days of operation and every month thereafter.