American Dryer Corp MD-170PTVW, MDG-120PVV installation manual H. Preparation For Operation

Models: MD-170PTVW

1 52
Download 52 pages 9.4 Kb
Page 28
Image 28
H. PREPARATION FOR OPERATION

H. PREPARATION FOR OPERATION

The following items should be checked before attempting to operate the dryer:

1.Read ALLCAUTION,” “WARNING,” and “DIRECTION” labels attached to the dryer.

2.Check incoming supply voltage to be sure that it is the same as indicated on the dryer data label. In case of 208 VAC or 230 VAC, the supply voltage must match the electric service exactly.

3.GAS MODELS – check to ensure that the dryer is connected to the type of heat/gas indicated on the dryer data label.

4.GAS MODELS – the sail switch damper assembly was installed and adjusted at the factory prior to shipping. However, each sail switch adjustment must be checked to ensure that this important safety control is functioning.

5.GAS MODELS – be sure that ALL gas shutoff valves are in the open position.

6.Be sure ALL back panels (guards) and electric box covers have been replaced.

7.Check ALL service doors to ensure that they are closed and secured in place.

8.Be sure lint drawer is securely in place.

NOTE: LINT DRAWER MUST BE ALLTHE WAY IN PLACE TO ACTIVATE SAFETY SWITCH OTHERWISE THE DRYER WILLNOT START.

9.Rotate the basket (tumbler) by hand to be sure it moves freely.

10.Check bolts, nuts, screws, terminals, and fittings for security.

11.GAS MODELS AND STEAM MODELS – check to ensure air supply (80 psi [5.51 bar]) is connected to the dryer.

12.STEAM MODELS – check to ensure ALL steam shutoff valves are open.

13.STEAM MODELS – check steam damper operation.

14.Check basket (tumbler) bearing setscrews to ensure they are ALL tight.

26

Maytag Co.

113395 - 6

Page 28
Image 28
American Dryer Corp MD-170PTVW, MDG-120PVV installation manual H. Preparation For Operation