Operation – Front Panel and Battery Compartment Cover Removal/Installation

Battery Compartment Cover installation

Place protrusions in slots at the bottom of the UPS.

Place top protrusions in slots where shown.

Attach with M6 screws to inner side panels in both sides.

20

Smart-UPS® VT 10-30kVA, 200/208V and XR Battery Enclosure Operation Guide 990-2359A

Page 28
Image 28
American Power Conversion 10-30 KVA, 200/208 V manual Battery Compartment Cover installation