Operation – Restart Procedure

Voltage confirmation

SEE!

Display introduction under The Display.

At the initial start-up, the display will prompt you through the following screens:

Confirm Voltage

Use 208V

Yes, use 208V

No, select another

When the Confirm Voltage prompt appears on the screen, select desired voltage and press

ENTER.

Apply load?

Yes

No

When the prompt Apply load appears, select Yes if you want the UPS to provide a load output now. (If you do not want a UPS load output at this point, select No).

Chrg xxx%

Load xxx%

xxxVin xxxVout xxHz Runtime: xxhr xxmin

Status screen

LOAD ON LED is now lit, and the display will show the Confirm Menu Screen.

NOTE!

The UPS is now ready to support the load.

NOTE!

Auto-detection on frequency – if problem occurs call APC Customer Support.

24

Smart-UPS® VT 10-30kVA, 200/208V and XR Battery Enclosure Operation Guide 990-2359A

Page 32
Image 32
American Power Conversion 10-30 KVA, 200/208 V manual Voltage confirmation, Enter