Operation – Front Panel and Battery Compartment Cover Removal/

Front Panel installation

Insert the two protrusions at the bottom of the Front Panel into the two slots at the bottom of the Enclosure.

Push the Front Panel into place.

To secure the Front Panel, turn the screw counterclockwise to locked position.

990-2359A Smart-UPS® VT 10-30kVA, 200/208V and XR Battery Enclosure Operation Guide