Restart Procedure

Power application

WARNING!

Only trained personnel familiar with the construction and the equipment may carry out the Start-Up procedure.

UPS

Utility breaker

XR Battery Enclosure

Set the utility breaker to the ON position.

If your installation includes an XR Battery Enclosure with a DC disconnect switch, set the DC disconnect switch to the ON position.

NOTE!

Wait approximately 30 seconds for the system to boot up and carry out self test.

After system boot-up, the display will automatically prompt you on how to confirm/select voltage and frequency as shown in the following.