Manuals
/
Brands
/
Computer Equipment
/
Power Supply
/
American Power Conversion
/
Computer Equipment
/
Power Supply
American Power Conversion
400V operation manual
1
1
100
100
Download
100 pages, 2.14 Mb
Smart Distribution
Panel with ATS
InfraStruXure Power
Generation System
400V
Operation Manual
Contents
Main
Page
About This Manual
Page
Contents
Safety ......................................................................1
Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Warnings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Overview .................................................................5
Operation ............................................................. 19
Generator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
Automatic Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
Emergency Manual Operation . . . . . . . . . . . . . . . . . . . . . . . . . 22
Total Power Off. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
Communication Configuration............................... 49
ATS Management Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49
Customizing and Updating the ATS ....................... 61
Page
Page
Safety
Overview
Cross-refe rence symbols used in this ma nual
Save these instructions
Safety symbols used in this manual
War ni ng s
Read these instructions
Inspection and testing
The InfraStruXure Power Generation System is an Optional Standby System
Wire sizing
Installation
Total power off procedure
Operating environment
Page
Overview
InfraStruXure Power Generation System
How the InfraStruXure Power Generation
System
Operation of the ATS during a mains failure when automatic operation is enabled
Generator start sequence
Generator cool-down
Open and closed transfers
Fuel monitoring/runtime calculation
Page
Smart Distribution Panel with ATS
Front view, door closed
Page
Page
Page
ATS Component Details
Motorized switches
Automatic operation control panel
User connection plate
ATS monitoring unit
ATS label kit
Operation
Automatic Operation
How to place the InfraStruXure Power Generation System in automatic operation
How to reset automatic operation on the ATS and on the generator
Problemloss of automatic operation
Emergency Manual Operation
Warningbefore you operate the ATS manually
How to power the load from the generator
Page
How to return to powering the load from mains
Page
Total Power Off
Page
Display Interface
Overview
Display Interface
30 Smart Distribution Panel with ATS
Top-level status screens
Note
On any top-level status screen, press the ENTER key to open the top-level menu screen.
Top-level menu screen
Navigating through screens
Password- protected scre ens
Load-Meter
Total Load by Phase
Power Factor
Total Load Summary
ATS/Voltage
ATS Positi on
S1-Utility
S2-Generator
ATS Setup
Page
Generator
Generator Status
Page
Tes ti ng
View Test Log Run/View Test
Test Sche dule
Test Dura tion
How a test occurs
Stats
Alarms
View Active Alarms
Alarm Setup
Alarm/Event Log
Alarm Beeper
Clearing latched alarms
Config
System/Network
Contacts & Relays
Page
Page
Communication Configuration
ATS Management Options
InfraStruXure Manager
Network management interfaces
Configuring the InfraStruXure Manager
Connect the ATS to the InfraStruXure Manager
Configuring the ATS Network Management Interface
Connect the ATS to your network
Configuration overview
TCP/IP configuration methods
Device IP Configuration Wizard
BOOTP & DHCP configuration
Page
Local access to the control console
Remote access to the control console
Control console
How to Access the ATS Network Management Interface
Web in terfac e
Teln et an d SSH
SNMP
FTP a nd SC P
How to Recover From a Lost Network Management Interface Password
Customizing and Updating the ATS
How to Connect User Input Contacts and Relay Outputs to the ATS
How to connect contacts to the ATS user connection plate
How to Connect an EPO Switch to the ATS
Connect an EPO switch to the user connection plate and test the switch
Page
Safety warnings
Page
How to Add Sub-Feed Output Distribution Circuit Breakers to the ATS
Output distribution circuit breakers available from APC
Only a certified electrician can add sub-feed output distribution breakers to the ATS.
Determine the configuration of the panel
Preparing the breakers for installation
Parts and tools needed for installation procedures
Installing breakers on the ATS panel board
How to Update ATS Firmware
Upgrading the ATS control processor
Downloading firmware updates from a local computer
Specifications
Smart Distribution Panel with ATS
Page
Page
Page
Warranty, Life-Support Policy, and Service
War ra nt y
Page
Life-Support Policy
Service
How to contact APC
Appendix A: Custom Installations
If Source 2 is a Second Mains Connection
Differences in your system from information presented in this manual
If Source 2 is a Generator that is Not an APC InfraStruXure Generator
Differences in your system from information presented in this manual
Index
A
B
C
D
H
I
K
L
M
T
U
W
Page
Radio Frequency Interference
*990-2355-001*
APC Worldwide Customer Support
990-2355-001 05/2005