Index
Smart Distribution Panel with ATS 85
A
Access panel, on panel board,13–
14
Accessing the display interface,67
Agency approvals,77
Alarm beeper,44
Alarm LED,29
Alarm/event log,43
Alarms
clearing latched,44
configuring limits,43–44
viewing active,43
Alarms screen,43–44
Allow closed setting,8
Arm/Test rocker switch,17
Armed LED,17
ATS product description,11–14
ATS/Voltage screen,33–36
Automatic operation,19–21
loss of,21
placing the generator system in
to,19
resetting on the ATS
generator,20
Automatic operation control
panel,12, 16
Automatic operation switch,16
B
Bad line quality,6
BOOTP configuration,53
Bottom access panel, location
of,11
C
Captive screw, location of,12
Check log LED,29
Circuit board port,17
Circuit breaker panel, determining
configuration of,69
Circuit breakers,68–72
availabe from APC,68
installing on the ATS panel
board,72
preparing for installation,70
tools needed for installation,71
Closed transfers,8
Communication converter, location
of,13
Compatible ATS equipment,5
Compliance,77
Components, of the ATS,15–18
Config screen,45–47
Configuration
electrical,47
of ATS communication,49–60
of contacts and relays,46
of system and network,45
of the EPO switch,63
Console port,17
Control console, local and remote
access to,55–56
Control processor upgrades,73
Coolant temperature limit,7
Cool-down period, of generator,7
Crank cycles,7
Crank setting,7
Crank time,7
Custom installations,83–84
Customizing the ATS,61–74
D
Dead front, description,12
Deadfront source label,18
DHCP configuration,54
DIP switches,17
Display interface,29–47
location of,12
navigating through screens,31
obtaining easy access to,67
screens,32–47
top-level screens,30
Display port,17
E
Electrical configuration,47
Electrical specifications,75
Elevation, for operation,3
Emergency manual operation,22–
26
powering the load from the
generator,23–24
returning to powering the load
from utility mains,25–26
Emergency Power Off
Arm/Test rocker switch,17
connecting the switch to the
ATS,63
contacts port, location of,17
DIP switches,17
safety warnings,66
where connected,16
Emissions verifications,77
Engine start test,39
Environment, for operation,3
Environmental specifications,77
EPO contacts port, location of,17
EPO. See Emergency Power Off.
Equipment, compatible with the
ATS,5
Ethernet port, on user connection
plate,16
F
Factory defaults, resetting the,47
Firmware, downloading
updates,73
Front bezel label,18
Front door, description,11
Front view
door closed,11
door open,12
FTP, for transferring new firmware
to the ATS,59
Fuel monitoring,9
Fuel status, where displayed,37
G
Generator label,18
Generator power, condition of,34
Generator screen,37–38