Manuals / Brands / Computer Equipment / Power Supply / American Power Conversion / Computer Equipment / Power Supply

American Power Conversion 400V operation manual - page 4

1 100
Download 100 pages, 2.14 Mb
Contents
Main Page About This Manual Page Contents Safety ......................................................................1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Warnings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 Overview .................................................................5 Operation ............................................................. 19 Generator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37 Automatic Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 Emergency Manual Operation . . . . . . . . . . . . . . . . . . . . . . . . . 22 Total Power Off. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 Communication Configuration............................... 49 ATS Management Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49 Customizing and Updating the ATS ....................... 61 Page Page Safety Overview Cross-refe rence symbols used in this ma nual Save these instructions Safety symbols used in this manual War ni ng s Read these instructions Inspection and testing The InfraStruXure Power Generation System is an Optional Standby System Wire sizing Installation Total power off procedure Operating environment Page Overview InfraStruXure Power Generation System How the InfraStruXure Power Generation System Operation of the ATS during a mains failure when automatic operation is enabled Generator start sequence Generator cool-down Open and closed transfers Fuel monitoring/runtime calculation Page Smart Distribution Panel with ATS Front view, door closed Page Page Page ATS Component Details Motorized switches Automatic operation control panel User connection plate ATS monitoring unit ATS label kit Operation Automatic Operation How to place the InfraStruXure Power Generation System in automatic operation How to reset automatic operation on the ATS and on the generator Problemloss of automatic operation Emergency Manual Operation Warningbefore you operate the ATS manually How to power the load from the generator Page How to return to powering the load from mains Page Total Power Off Page Display Interface Overview Display Interface 30 Smart Distribution Panel with ATS Top-level status screens Note On any top-level status screen, press the ENTER key to open the top-level menu screen. Top-level menu screen Navigating through screens Password- protected scre ens Load-Meter Total Load by Phase Power Factor Total Load Summary ATS/Voltage ATS Positi on S1-Utility S2-Generator ATS Setup Page Generator Generator Status Page Tes ti ng View Test Log Run/View Test Test Sche dule Test Dura tion How a test occurs Stats Alarms View Active Alarms Alarm Setup Alarm/Event Log Alarm Beeper Clearing latched alarms Config System/Network Contacts & Relays Page Page Communication Configuration ATS Management Options InfraStruXure Manager Network management interfaces Configuring the InfraStruXure Manager Connect the ATS to the InfraStruXure Manager Configuring the ATS Network Management Interface Connect the ATS to your network Configuration overview TCP/IP configuration methods Device IP Configuration Wizard BOOTP & DHCP configuration Page Local access to the control console Remote access to the control console Control console How to Access the ATS Network Management Interface Web in terfac e Teln et an d SSH SNMP FTP a nd SC P How to Recover From a Lost Network Management Interface Password Customizing and Updating the ATS How to Connect User Input Contacts and Relay Outputs to the ATS How to connect contacts to the ATS user connection plate How to Connect an EPO Switch to the ATS Connect an EPO switch to the user connection plate and test the switch Page Safety warnings Page How to Add Sub-Feed Output Distribution Circuit Breakers to the ATS Output distribution circuit breakers available from APC Only a certified electrician can add sub-feed output distribution breakers to the ATS. Determine the configuration of the panel Preparing the breakers for installation Parts and tools needed for installation procedures Installing breakers on the ATS panel board How to Update ATS Firmware Upgrading the ATS control processor Downloading firmware updates from a local computer Specifications Smart Distribution Panel with ATS Page Page Page Warranty, Life-Support Policy, and Service War ra nt y Page Life-Support Policy Service How to contact APC Appendix A: Custom Installations If Source 2 is a Second Mains Connection Differences in your system from information presented in this manual If Source 2 is a Generator that is Not an APC InfraStruXure Generator Differences in your system from information presented in this manual Index A B C D H I K L M T U W Page Radio Frequency Interference *990-2355-001* APC Worldwide Customer Support 990-2355-001 05/2005