5)Use a Digital voltmeter to measure the system voltage using the “RTN” (+) and
3.11.Battery and Load Power up
After the initial checkout has been performed, the following steps are followed to complete the system power up procedure.
1)Turn on the external circuit breaker from the battery to the power plant.
2)Load circuit protection may now be enabled as required.
MX06 Power Plant User’s Manual | Page 16 |