| Table of Contents |
|
1 | Safety First! | 1 |
|
| |
1.1. |
| WARNING SYMBOLS | 1 | ||
1.2. |
| GENERAL PRECAUTIONS: | 1 | ||
2 | Introduction | 2 |
|
| |
2.1. |
| GENERAL INFORMATION | 2 | ||
2.2. | HOW TO USE THIS MANUAL | 4 | |||
3 | Installation | 5 |
|
| |
3.1. |
| UNPACKING EQUIPMENT | 5 | ||
3.2. |
| MECHANICAL INSTALLATION | 5 | ||
Room / Location | ...................................................................................................................... | 5 | |||
Mounting |
| 5 | |||
Ventilation |
| 6 | |||
3.3. |
| AC POWER CONNECTIONS | 6 | ||
3.4. |
| BATTERY CONNECTIONS | 7 | ||
Planning the Battery installation | 7 | ||||
Connecting the Battery Cables | 7 | ||||
Battery LVD Connection | 8 | ||||
Multiple Battery Strings | 8 | ||||
Battery Temperature Probe Installation | 10 | ||||
3.5. |
| DC SYSTEM GROUNDING | 10 | ||
3.6. |
| LOAD PROTECTION INSTALLATION | 11 | ||
Circuit Breaker Installation | 11 | ||||
GMT Fuse Installation | 11 | ||||
3.7. |
| LOAD CONNECTIONS | 12 | ||
Cable Size Considerations | 12 | ||||
Circuit Breaker Protected Load Connections (30 or 60 Amps) | 12 | ||||
GMT Fuse protected Load Connections | 13 | ||||
3.8. |
| INPUT / OUTPUT CONNECTIONS | 13 | ||
Relay Output Connections | 13 | ||||
External Alarm Input Connections | 14 | ||||
3.9. |
| RECTIFIER MODULE INSTALLATION | 15 | ||
3.10. | INITIAL | 15 | |||
3.11. | BATTERY AND LOAD POWER UP | 16 | |||
4 | Technical Description | 17 |
| ||
4.1. |
| RECTIFIER MANAGEMENT | 17 | ||
AC Input Power |
| 17 | |||
DC Output Power | 17 | ||||
System Output Capacity | 17 | ||||
Rectifier alarms reporting | 17 | ||||
4.2. |
| SYSTEM MANAGEMENT | 18 | ||
Control Functions | 18 | ||||
Alarm Functions |
| 18 | |||
Displays |
| 18 | |||
MX06 Power Plant User’s Manual |
| Page ii |