6 Inch Concentric Termination Installation
6” x 4” STANDARD | INTAKE AIR CONNECTION | |||||||
REDUCER | BUSHING | 6” or 4” PVC | INTAKE AIR PIPE | |||||
|
|
| 6” x 6” x 6” |
| VENT TERMINAL | |||
|
|
| Y FITTING |
| ||||
|
|
|
| WITH SCREEN | ||||
|
|
|
|
| ||||
|
| VENT PIPE |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11.Push the vent cap/vent pipe assembly into the intake air Y fitting assembly until the vent cap seats properly on the large diameter intake air pipe. Ensure the vent pipe is cemented to the no
|
| VENT | 6” x 4” NO | VENT CAP |
| ||||
CONNECTION | REDUCER BUSHING | STAINLESS STEEL | ||
4” PVC |
|
|
VENT PIPE IS 4 INCH SCHEDULE 40 PVC
SUPPLIED LENGTH 46 1/2 INCHES (118 cm)
MAXIMUM ALLOWABLE LENGTH 66 1/2 INCHES (169 cm)
MINIMUM ALLOWABLE LENGTH 33 1/8 INCHES (84 cm)
INTAKE AIR PIPE IS 6 INCH SCHEDULE 40 PVC
SUPPLIED LENGTH 25 3/8 INCHES (64 cm)
MAXIMUM ALLOWABLE LENGTH 45 3/8 INCHES (115 cm)
MINIMUM ALLOWABLE LENGTH 12 INCHES (30 cm)
INTAKE AIR PIPE
Y FITTING ASSEMBLY
VENT CAP
VENT PIPE ASSEMBLY
6 INCH CONCENTRIC TERMINATION KIT
SEVEN PIECE KIT - FIELD ASSEMBLY REQUIRED
COMBUSTION
AIR
ROOF FLASHING (field supplied)
INTAKE
AIR PIPE
VENT | MAINTAIN 12” (30 cm) | ||||
|
|
|
| 18” (45 cm) FOR CANADA | |
|
|
|
| MINIMUM CLEARANCE | |
|
|
|
| ABOVE HIGHEST ANTICIPATED | |
|
|
|
| ||
|
|
|
| SNOW LEVEL. MAXIMUM OF | |
|
|
|
| 24” (60 cm) ABOVE ROOF. | |
|
|
|
| ||
|
|
|
| ||
|
|
|
|
|
|
STRAP (field supplied)
NOTE: SECURING STRAP
MUST BE FIELD INSTALLED
TO PREVENT MOVEMENT
OF TERMINATION KIT
VENT
PIPE
Figure 29
Assemble and install the 6 inch concentric termination. Refer to Figure 29, Figure 30 and Figure 31 for these instructions:
1. Cement the Y fitting to the larger diameter intake air pipe. |
6 INCH CONCENTRIC TERMINATION
VERTICAL INSTALLATION
Figure 30
2. | Cement the 6” x 4” no |
| straight (vent) end of the Y fitting. |
3. | If the intake air piping being installed is 4 inch pipe, cement |
| the 6” x 4” standard reducer bushing into the angle (intake |
| air) end of the Y fitting as shown in Figure 29. |
4. | If the intake air piping being installed is 6 inch pipe discard |
| the 6” x 4” standard reducer bushing. The 6 inch intake air |
| piping will connect directly to the angle end of the Y fitting. |
5. | Slide the intake air Y fitting assembly from inside the building |
| through the hole cut for the termination in the roof or sidewall. |
| Ensure no foreign materials such as insulation accumulate |
| inside the assembly. |
6. | Secure the intake air Y fitting assembly using field supplied |
| metal strapping or equivalent support materials. |
7. | On installations installed through the roof slide a field |
NOTE: SECURING STRAP MUST BE FIELD INSTALLED TO PREVENT MOVEMENT OF TERMINATION KIT IN SIDEWALL.
STRAP
VENT(field supplied)
PIPE
INTAKE
AIR PIPE
COMBUSTION |
AIR |
VENT |
1 INCH |
MAXIMUM |
| supplied plumbing boot or roof flashing over the intake air Y |
| fitting assembly and secure it to the roof. |
8. | Seal around the plumbing boot or roof flashing. |
9. | Slide the steel vent cap onto the 4 inch vent pipe and cement |
| the vent terminal to the end of the vent pipe. |
10. | Slide the vent cap back up the vent pipe until it touches the |
| vent terminal. Secure the vent cap to the vent pipe using field |
| supplied stainless steel screws. Pilot holes must be drilled for the |
| screws to prevent damage/cracking of the vent pipe. Apply water |
| proof silicone sealant between the vent cap and the terminal. |
6 INCH CONCENTRIC TERMINATION
SIDEWALL INSTALLATION
Figure 31
12.Connect the intake air and vent piping from the water heater to the 6 inch concentric termination. Use field supplied 4 inch couplings or 6” x 4” reducer couplings as needed.
13.Return to Direct Vent Installation on page 23 to complete the installation of the intake air and vent piping between the concentric termination and the water heater.
29