Maintenance (cont.)

Redundant, parallel UPS

See figures 27 and 28 in the Appendix. During maintenance, a UPS unit must be isolated from the normal AC source, its battery and the output circuits of the other UPS units.

isolate one UPS (see figure 27) Proceed in the following order (see figure 25 without Q3BP):

shut down the inverter (press the "inverter OFF" button 9 for three seconds),

open isolating switches Q5N, Q4S, QF1 and Q1.

The UPS unit is powered down once the capacitors have discharged (a few minutes);

start-up

Following servicing, proceed in the following order (see figure 26 without Q3BP):

close switch Q1, then after approximately ten seconds, switches QF1, Q5N and Q4S,

start the inverter (press the "inverter ON" button 8 ).

Note: if the load is still supplied

by an inverter, the Q3BP switch on the unit undergoing maintenance must not be closed.

To fully isolate the installation, proceed as indicated below:

isolate all UPSs (see figure 28) Proceed in the following order (see figure 25):

shut down the inverters (press the "inverter OFF" buttons 9 for three seconds),

close the Q3BP switches used to bypass the units (no units have priority),

open isolating switches Q5N, Q4S, QF1 and Q1.

The UPS units are powered down once the capacitors have discharged (a few minutes).

start-up

Following servicing, proceed in the following order (see figure 26):

close switches Q1, then after approximately ten seconds, switches QF1, Q5N and Q4S,

open the Q3BP switches,

start the inverters (press the "inverter ON" buttons 8 ).

Q1

A

B

 

Q5N

1

 

 

 

QF1

 

 

D

 

2

Q4S

 

 

 

 

Q3BP

C

Q1

A

B

 

Q5N

1

 

 

 

QF1

 

 

D

 

2

Q4S

 

 

 

 

Q3BP

C

Fig. 27

Q1

A

B

 

Q5N

1

 

 

 

QF1

 

 

D

 

2

Q4

 

 

 

 

Q3BP

C

Q1

A

B

 

Q5N

1

 

 

 

QF1

 

 

D

 

2

Q4S

 

 

 

 

Q3BP

C

Fig. 28

E-51028230XT/BG - 35

Page 35
Image 35
APC 20 - 200 KVA user manual Redundant, parallel UPS, Start-up