installation

Instructions for opening the casing and performing an internal inspection

Before performing any work on the boiler, first disconnect it from the electrical power supply using the external bipolar switch; removing the fuse and shutting off the gas cock.

To access the inside of the boiler, the following is necessary:

1.Remove the casing by unhooking it from the control panel (a)

2.Loosen the two screws on the front casing (b), pull it forwards and unhook it from the upper pins (c)

3.Lower the control panel (d)

4.Unhook the two clips on the combustion chamber panel and lift off (e).

(a)

(b)

(c)

(d)

(e)

To calculate the size of the heating installation, refer to the "Available pressure" graph below.

Graph representing the available circulation pump pressure ΔT20oC

mbar

 

 

 

 

 

 

 

 

 

 

 

 

500

 

 

 

 

 

 

 

 

 

 

 

 

450

 

 

 

 

 

 

 

 

 

 

 

 

400

 

 

 

 

 

 

 

 

 

 

 

 

350

 

 

 

 

 

 

 

 

30-38 kW

 

 

 

 

 

 

 

 

 

 

 

 

 

300

 

 

 

 

 

 

 

 

 

 

 

 

250

 

 

 

 

24 kW

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

200

 

 

 

 

 

 

 

 

 

 

 

 

150

 

 

 

 

 

 

 

 

 

 

 

 

100

 

 

 

 

 

 

 

 

 

 

 

 

50

 

 

 

 

 

 

 

 

 

 

 

 

0

 

 

 

 

 

 

 

 

 

 

 

 

0

100

200

300

400

500

600

700

800

900

1000

1100

1200

 

 

 

 

 

 

 

 

 

 

 

 

l/h

Before the equipment is used, for the first time the trap must be filled with water. To do this, add approximately 1/4 litre of water via the flue outlet before fitting the flue system, or uns- crew the cap on the trap positioned underneath the boiler, fill it with water and refit it.

Warning!

Insufficient water in the trap can temporarily cause the flue gas to be expelled into the surrounding ambient air.

 

G

 

E

 

D

F

C

 

B

H

A

 

I

 

16

Page 16
Image 16
Ariston E-COMBI 24 30 38 manual Mbar