Sensor Regeneration
Sensor regeneration is needed to clear the
•At the beginning of the day on which the instrument is to be used.
•During the day when the sensor becomes saturated.
•At the end of the day before storing the instrument.
CAUTION:
Ensure the voltage selector on the back of the instrument, near the power cord inlet connector, points to the local AC power value. See “Setting the Input Voltage” on page 21.
To clean and protect the sensor, the supplied AC power must be 100 to 120 VAC or 220 to 240 VAC, depending on the available power source.
Once sensor regeneration is initiated, DO NOT interrupt the cycle.
•Attach the power cord to the
•Press the power ON button.
•Press the REGEN button.
The digital meter flashes .H.H.H for the duration of the
.0.0.0 when the cycle is completed.
DO NOT INTERRUPT THIS CYCLE.
Wait until the cycle is completed before continuing with the next step.
•A minimum
NOTE: The digital meter will read .P.P.P after REGEN is activated if the power cord is not plugged in or if the instrument's fuse needs to be replaced. Connect the power cord, or if necessary, replace the fuse. See “Changing the Fuse” on page 22.
Page 12 of 50 | AZI Customer Service |