TOOLS REQUIRED FOR INSTALLATION
•Voltmeter
•Ammeter
•Ohmmeter
•Screwdrivers (Phillips & flat head)
•2 wire restrainers
•Wire cutters
•Wire strippers
•#6 AWG 3 wire (plus ground)
ITEMS REQUIRED FOR THE
INSTALLATION OF YOUR SPA
•At least four people are required at time of delivery to place your spa into position.
•220 Volt Electrical Service
•An Electrician to do the electrical connection.
•50 Amp GFCI circuit breaker (included with your spa, see page 8)
•An Allen Key to open and remove the access panel. (sup- plied by Aruba Spas)
4