4
TOOLS REQUIRED FOR INSTALLATION
• Voltmeter
• Ammeter
• Ohmmeter
• Screwdrivers (Phillips & flat head)
• 2 wire restrainers
• Wire cutters
• Wire strippers
#6 AWG 3 wire (plus ground)
ITEMS REQUIRED FOR THE INSTALLATION OF YOUR SPA
At least four people are required at time of delivery to
place your spa into position.
• 220 Volt Electrical Service
• An Electrician to do the electrical connection.
• 50 Amp GFCI circuit breaker (included with your spa, see
page 8)
• An Allen Key to open and remove the access panel. (sup-
plied by Aruba Spas)