INITIAL START-UP

Before proceeding with the initial start-up, make sure you have completed the start-up preparations from the previous section. The following procedures must be done in the order they are listed.

HAZARD

This system should be set to maintain

a water temperature NO GREATER THAN

40° CELSIUS (104° F).

1.Make sure all of the jets are in the full open position, (refer to Hydrotherapy Jets, page 13).

2.The Electronic Operating System spa control has automatic functions that operate upon start-up and normal operation to protect the system.

3.With the breaker in the “On” position check to see if water is circulating and pump is running. If not then you must turn the power off to prime the pump. To prime the pump turn union #1 slowly 1/2 to 1 turn to release air, being careful not to open too far. If you are sure that you have released the air lock, retighten the union and turn the power on. The pump must be primed every time the water is changed. Check to see if water is coming from all the jets.

WARNING

Only turn union one turn

counter clockwise.

4)Press the pump button on the control panel to test if the pump is changing from low to high-speed, (refer to Topside Control Component Identification, next page). You will be able to tell the difference between low and high-speed by the sound of the water moving through the spa’s plumbing system. Press the pump button again to return the pump to low speed.

5)Once the water has reached the set temperature add chem- icals to adjust the water balance (see Chemical Maintenance, page 19).

6)If you experience any problems with the procedures above contact an Aruba customer service representative.

12

Page 13
Image 13
Aruba Spa Hot Tub Models 2003 owner manual Initial START-UP, Only turn union one turn Counter clockwise