8
YARD INSTALLATION
Position your spa above ground in an area with good
drainage, on a level surface that contacts the spa fully. The
ideal base is a concrete pad, however compacted gravel,
paving stones or railway ties may also be used. Locate the
spa so the equipment door is readily accessible. The equip-
ment has to be above grade and not subject to flooding. If
using compacted gravel, it must be on a firm level base and
it must be contained in a secure wood or concrete border so
that the loose gravel cannot shift once the spa is in place.
DECK INSTALLATION
Before placing your spa on a deck or other raised platform,
you must have the structure checked for its loading capacity
by an Engineer or competent contractor. The minimum load
capacity is 100 lbs per square foot. Before placing the spa on
the deck, you should place 1.5” high-density foam insulation
under the spa. This helps insulate the spa and prevent the
transmission of noise. At the same time providing the under-
side of the spa with extra insulation.
WARNING

One must support the entire base of the

spa, from the outside edges to the centre, to

support its weight. Improper placement of

your spa may void the warranty.