Chapter 6. Port Access
Power Management
If a PN0108 is connected to the KVM Over the NET™ switch, and a device is connected to one of the PN0108’s outlets, you can power manage (On, Off, Reboot) selected outlets directly from this page, instead of having to select them on the PON device, itself.
Note: This section only appears if a PN device is connected.
Associating outlets with a port is accomplished on the Port Access → Port Configuration → Power Management page (see page 122 for details).
If there is more than one outlet associated with this port, click on the line entry to select the one you want to manage, then click the On, Off, or Reboot icon, as appropriate.
Note: For the Reboot option, the outlet must be configured with System After AC Back or Modem Ring Resume as its operating mode.
If there is more than one outlet associated with this port, and you want to power manage several of them at once, use
If there is more than one outlet associated with this port, and you want to power manage all of them at once, click to put a checkmark in the Select All checkbox.
Note: 1. Even though the outlets all turn On, Off, or Reboot at the same time, they do so with their own separate outlet configuration settings (delay, operating mode, etc. See Port Configuration, page 119 for details).
2.For the Reboot option, the outlet must be configured with System After AC Back or Modem Ring Resume as its operating mode.
The Synchronization checkbox is read only. Whether it is enabled or not is set on the Port Configuration → Power Management page (see page 119). When Synchronization is enabled, the outlets on devices with more than one power supply can all be operated at the same time.
Note: For the Reboot option, the outlets must be configured with System After AC Back as the operating mode.
94