Belshaw Brothers TG 50 manual Unloading and Uncrating, Do Not Lift Excessive Weight

Models: TG 50

1 64
Download 64 pages 27.72 Kb
Page 7
Image 7
1 Unloading and Uncrating

1 Unloading and Uncrating

DO NOT LIFT EXCESSIVE

WEIGHT

Once the crate has been delivered, immediately take the covers off the crate and inspect for hidden damage. If damage is found, please see the above information to make a damage claim to the shipping company. After inspection, cut the banding and remove any other restrains from the Thermoglaze unit. Remove the banding and other packing material from the Thermolizer unit. Roll the Thermolizer, carefully, off the skid first and move it near the area where it will be assembled. Roll the Thermoglaze unit, carefully, off the skid and move it near the area where it will be assembled.

Do not connect the Thermoglaze or the Thermolizer to electrical power before completing the assembly and placement of the products.

Figure 1-1 shows the system in the crate ready to be unpacked. The cartons under the Thermoglaze contain the glaze trough and oven guard. See Section 4 to assemble the unit. The carton in the Thermolizer contains the doors and other interior parts. See Thermolizer manual for assembly instructions.

The Thermoglaze system has been designed for quick assembly and installation. Within a few minutes of receiving the system, the installer can have the Thermoglaze ready to make donuts if the electrical connections are properly installed and inspected by the prevailing local authorities.

Figure 1-1

Belshaw Bros., Inc. 1750 22nd Ave. S. Seattle, WA 98144 Phone 206-322-5474 Fax 206-322-5425

Thermoglaze 50

MN-1716EN

1

Page 7
Image 7
Belshaw Brothers TG 50 manual Unloading and Uncrating, Do Not Lift Excessive Weight