5. Install the 4 wing nuts finger tight.
6.Set the upper gasket on top of the glaze pump.
7. Install the drip pan and glaze reservoir.
8. Install the upper clamp.
9. Install the lower gasket, hose and clamp.
10. Install the columnating plates.
Belshaw Bros., Inc. • 1750 22nd Ave. S. • Seattle, WA 98144 • Phone
Thermoglaze 50 |
| 17 |