INSTALLATION
Vertically With New Chimney System
NOTE: FOLLOW
OPTION: To achieve a center vertical installation a 45º elbow and a
Always maintain 3” clearance from combustible materials. When passing through additional floors or ceilings, always install fire stop spacer.
After lining up for hole in roof, cut either a round or square hole in roof, always 3” larger all the way around pipe. Install upper edge and sides of flashing under roofing materials, nail to the roof along upper edge. Do not nail lower edge. Seal nail heads with
Apply
Vertically Into Existing Chimney System
The recommended installation method is to run the 3” or 4”
FOLLOW GUIDELINES FOR EQUIVALENT VENT LENGTH.
5