7

Jobsite Set-Up Guidelines

Time spent planning your equipment’s placement (layout) at the job site will benefit
both the operation of the equipment and the safety of your crew at the site. It is
best to determine the layout of all equipment before disconnecting, stabilizing and
leveling the Figure-8 Eliminator Trailer. Because no two job sites are the same, the
illustrations that follow should be used as general guidelines to get the most benefit
and safest operation from your Figure-8 Eliminator Trailer.
Cable Installation—First Run
Prepare Figure-8 Eliminator Trailer for Cable Loading
Load Cable to Figure-8 Eliminator Trailer
Cable Installation—Second Run
3.