SAFETY CONSIDERATIONS
CONTENTS
II. Start Up Heating Section and
III. Start Up Cooling Section and
Page
Page
Page
Page
Page
Page
Page
Page
I. STEP 1 Ð CHECK EQUIPMENT A. Identify Unit
RECEIVING AND INSTALLATION
B. Inspect Shipment
II. STEP 2 Ð PROVIDE UNIT SUPPORT A. Roof Curb
Ð11Ð
Fig. 10 Ð Roof Curb Dimensions
Fig. 12 Ð Suggested Rigging for Units Without
Fig. 11 Ð Slab Mounting Details
Base Rail
Fig. 13 Ð Suggested Rigging for Units With
VIII. STEP 8 Ð INSTALL GAS PIPING
VII. STEP 7 Ð INSTALL FLUE HOOD
B. Units With Optional Base Rail
VI. STEP 6 Ð CONNECT CONDENSATE DRAIN
Ð14Ð
Table 1 Ð Physical Data Ð Unit 588A
Ð15Ð
Table 2 Ð Physical Data Ð Unit 589A
A. Conguring Units for Down¯ow Vertical Discharge
IX. STEP 9 Ð INSTALL DUCT CONNECTIONS
Fig. 15 Ð Sediment Trap
Fig. 16 Ð Supply and Return Duct Openings
Table 3 Ð Maximum Gas Flow Capacity
Fig. 18 Ð Vertical Duct Cover Removed
Fig. 17 Ð Lance Location for Vertical Duct
A.High-VoltageConnections
X. STEP 10 Ð INSTALL ELECTRICAL CONNECTIONS
Fig. 20 Ð Vertical Discharge Cover Removed
Ð19Ð
Table 4A Ð Electrical Data Ð Unit 588A
Ð20Ð
Table 4B Ð Electrical Data Ð Unit 589A
Fig. 21 Ð High- and Control-VoltageConnections
B.Special Procedures for 208-VOperation
Fig. 22 Ð Easy Select Interface Board
E. Heat Anticipator Setting
F. Transformer Protection
PRE-START-UP
C. Adjust Gas Input
II.START UP HEATING SECTION AND MAKE ADJUSTMENTS
Fig. 23 Ð Fan Blade Clearance START-UP
I. CHECK FOR REFRIGERANT LEAKS
Fig. 24 Ð Burner Assembly
Fig. 25 Ð Monoport Burners
E. Air¯ow and Temperature Rise
D.Check Burner Flame
H. Auxiliary Limit Switch Ð Rollout
G. Limit Switches
III.START UP COOLING SECTION AND MAKE ADJUSTMENTS
F. Heating Sequence of Operation
Ð27Ð
Ð28Ð
Ð29Ð
Ð30Ð
Ð31Ð
Ð32Ð
Ð33Ð
Ð34Ð
C. Indoor Air¯ow and Air¯ow Adjustments
B. Checking and Adjusting Refrigerant Charge
Table 8B Ð Superheat Charging Table, 588A024
Table 8A Ð Superheat Charging Table, 588A018
Table 8D Ð Superheat Charging Table, 588A036
Table 8C Ð Superheat Charging Table, 588A030
Table 8E Ð Superheat Charging Table, 588A042
Ð37Ð
Table 8H Ð Superheat Charging Table, 588A060
Table 9B Ð Superheat Charging Table, 589A030
Table 9A Ð Superheat Charging Table, 589A024
Table 9C Ð Superheat Charging Table, 589A036
Ð39Ð
Table 9E Ð Superheat Charging Table, 589A048
Table 9D Ð Superheat Charging Table, 589A042
Table 9F Ð Superheat Charging Table, 589A060
Ð40Ð
Ð41Ð
Table 10 Ð Required Suction-TubeTemperature F
Deduct 10% from Cfm and Watts for 208 V Operation
Ð42Ð
Deduct 10% from Cfm and Watts for 208 V Operation
Deduct 10% from Cfm and Watts for 208 V Operation
Motor Units at 230-VDeduct 10% from Cfm for
Table 15 Ð Dry Coil Air Delivery* Ð Heating Ð
Operation
Deduct 10% from Cfm and Watts for 208 V Operation
D. Cooling Sequence of Operation
MAINTENANCE
Table 17 Ð Wet Coil Pressure Drop
I. AIR FILTER
Fig. 34 Ð Blower Housing and Flue Collector Box
II. UNIT TOP REMOVAL
III.EVAPORATOR BLOWER AND MOTOR
VI. LIMIT SWITCH
Fig. 35 Ð Burner Access Panel
V. COMBUSTION-AIRBLOWER
VII. BURNER IGNITION
X. CONDENSER FAN
XI. ELECTRICAL CONTROLS AND WIRING
XII. REFRIGERANT CIRCUIT
XIII. GAS INPUT
SYMPTOM
TROUBLESHOOTING Cooling
Three-phasescroll
CAUSE
Poor ¯ame characteristics
IFM runs when it
Cooling cont
Integrated control
Limit switch fault
LED Troubleshooting Ð Error Code
Flame sense fault
4 consecutive limit switch
Page
TEMPERATURES
START-UPCHECKLIST
Remove and Store in Job File
I. PRELIMINARY INFORMATION