SERVICE
This section provides procedures for testing and replacing various major components used in this brewer should service become necessary. Refer to Troubleshooting for assistance in determining the cause of any problem.
WARNING - Inspection, testing, and repair of electri- cal equipment should be performed only by qualified service personnel. The brewer should be unplugged when servicing, except when electrical tests are re- quired and the test procedure specifically states to
COMPONENT ACCESS
WARNING - Disconnect the brewer from the power source before the removal of any panel or the replace- ment of any component.
All components are accessible by the removal of the top cover, front inspection panel and warmer plate(s).
The top cover is attached with one
The front inspection panel is attached with four #6- 32 screws.
The warmer assembly is attached with three
Contents |
|
Control Thermostat | 14 |
Limit Thermostat | 16 |
ON/OFF Switch | 17 |
Solenoid (Inlet) | 18 |
Start Switch (Brew) | 19 |
Tank Heater | 20 |
Tank Heater Switch | 22 |
Thermal | 24 |
Timer (Early Model) | 25 |
Digital Brew Timer (Late Model) | 27 |
Warmer Element | 29 |
Wiring Diagrams | 30,31 & 32 |
FIG. 1 COMPONENT ACCESS | P939 |
|
CONTROL THERMOSTAT
FIG. 2 CONTROL THERMOSTAT | P2186.40 |
|
Location:
The control thermostat is located inside the trunk on the upper left side of the component bracket.
Page 14 | 10478 061500 |
|