Bunn CRT5, CRTF5 service manual SERVICE cont TANK HEATER SWITCH cont

Models: CRT5 CRTF5

1 32
Download 32 pages 58.84 Kb
Page 23
Image 23
SERVICE (cont.)

SERVICE (cont.)

TANK HEATER SWITCH (cont.)

14.Reconnect the two black wires to the tank heater switch terminals.

15.Set tank assembly inside the hood on mounting brackets and secure with two #8-32 screws.

16.Reconnect the wires to the limit thermostat, tank heater and the control thermostat. Refer to limit thermostat, tank heater and control thermostat sections in this manual when reconnecting wires.

17.Brewers with faucet reinstall the faucet tube and reconnect the water supply tube to the coil assem- bly.

18.Secure the sprayhead tube to the hood using hex nut.

19.Install sprayhead.

20.Install fill basin, inlet gasket and secure to tank lid with tank inlet fitting.

21.Carefully install water fill tube into the back of the fill basin.

22.Reconnect and turn on the incoming water supply.

23.Refer to Fig. 15 when reconnecting the wires.

Manual backgroundManual background BLK to Limit Thermostat

BLK to Terminal Block (Black Insert)

P1135.80

FIG. 15 TANK HEATER SWITCH TERMINALS

Page 23

10478 061500

 

Page 23
Image 23
Bunn CRT5, CRTF5 service manual SERVICE cont TANK HEATER SWITCH cont