PLUMBING REQUIREMENTS (cont.)
P2188
MODELS W/OUT FAUCET
Models CRT5, CRT5A & CRT5B
1.Remove the shipping cap from the bulkhead fitting on the rear of the brewer.
2.Attach the flare fitting from the short piece of tubing on the flow control (supplied) to the water inlet fitting at the rear of the brewer.
3.Flush the water line and securely attach it to the flare fitting on the strainer/flow control.
4.Turn on the water supply.
P2187
MODELS W/FAUCET & INTERNAL
FLOW CONTROL
Models CRTF5 & CRTF5B
1Remove shipping caps from the bulkhead fittings
on the rear of the brewer.
2.Attach the female flare fitting on the tube from the needle valve to the upper fitting on the rear of the
brewer and the female flare fitting on the manifold to the lower fitting on the rear of the brewer.
3Flush the water supply line and securely attach it to the male flare fitting on the manifold.
4.Turn on the water supply.
5.Place an empty vessel beneath the faucet and lift the handle until water is dispensed.
MODELS W/FAUCET & EXTERNAL
FLOW CONTROL
Models CRTF5, CRTF5A & CRTF5B
1.Remove the shipping caps from the bulkhead fittings on the rear of the brewer.
2.Attach the flare fitting from the short piece of tubing on the flow control (supplied) to the lower water inlet fitting at the rear of the brewer.
3.Attach the flare fitting from the short piece of tubing on the tee (supplied) to the upper water inlet fitting at the rear of the brewer.
4.Flush the water supply line and securely attach it to the flare fitting on the tee.
5.Turn on the water supply.
6.Place an empty vessel beneath the faucet and lift the handle until water is dispensed.
Page 5 | 10478 011597 |
|